X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294210911000

Well Details

Well ID: 0294210911000
Loading map...
Location: 00/11-09-029-21W4/0
Location Alias: 00/11-09-29-21 W4M
Location Alias 2: 00/11-09-029-21 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 21
Section: 09
County/Municipality: Kneehill County
Well Name: PCP WAYNE-ROSEDALE 11-9-29-21
Operator Name: Lynx Energy ULC
License Number: 0206885
License Date: 1997-10-03
License Status: Issued
Spud Date: 1997-10-15
Final Drill Date: 1997-10-27
Well Total Depth: 1850.00 m
Surface Hole Latitude: 51.465412
Surface Hole Longitude: -112.900777

For data sources see[1][2]

Well History

Date Event
1997-10-03 Obtained License
1997-10-15 Surface Casing Operation Performed
1997-10-17 Direction Drilling Operation Performed - Deviate
1997-10-27 Finished Drilling
1997-10-27 Well Log Performed
1997-10-27 Well Mode changed to Drilled and Cased
1997-10-29 Production Casing Operation Performed
1997-10-29 Rig Released
1997-10-30 Well Log Performed
1997-11-09 Well Log Performed
1997-11-14 Well Log Performed
1997-11-16 Perforation Treatment Performed - Jet Perforation
1997-11-16 Well Began Production
1997-11-16 Well Fluid changed to Crude Oil
1997-11-16 Well Mode changed to Flowing
1997-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-23 Well Fluid changed to Crude Oil
1997-11-23 Well Mode changed to Suspended
1997-12-09 Well Fluid changed to Crude Oil
1997-12-09 Well Mode changed to Flowing
1999-10-02 Well Fluid changed to Crude Oil
1999-10-02 Well Mode changed to Pumping
2003-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-22 Plug Back Performed
2003-09-22 Well Fluid changed to Crude Oil
2003-09-22 Well Log Performed
2003-09-22 Well Mode changed to Abandoned Zone
2005-01-05 Perforation Treatment Performed - Jet Perforation
2005-01-05 Well Log Performed
2005-01-17 Well Log Performed
2005-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-01-18 Perforation Treatment Performed - Jet Perforation
2005-01-18 Plug Back Performed
2005-01-18 Well Log Performed
2011-08-08 Perforation Treatment Performed - Jet Perforation
2011-08-08 Well Log Performed
2011-08-28 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-10-17 796.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-11-16 Perforation 1751.00 1757.00 13
1997-11-20 Acid Treatment 1751.00 1757.00 0
2003-09-22 Packing Device Capped w/Cement 1729.00 1737.00 0
2005-01-05 Perforation 1394.00 1396.00 17
2005-01-18 Packing Device Capped w/Cement 1382.00 1390.00 0
2005-01-18 Perforation 1368.00 1370.00 17
2011-08-08 Perforation 1194.00 1197.00 20
2011-08-28 Fracture 1194.00 1197.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 346 0.0 0.0 0.0
1998 4821 0.0 0.0 0.0
1999 4045 0.0 0.0 0.0
2000 8078 0.0 0.0 0.0
2001 8538 0.0 0.0 0.0
2002 8026 0.0 0.0 0.0
2003 2627 0.0 0.0 0.0

For data sources see[6]

References