If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294202101000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.492398,"lon":-112.744629,"icon":""}]} |
Location: 00/01-21-029-20W4/0 | |
Location Alias: 00/01-21-29-20 W4M | |
Location Alias 2: 00/01-21-029-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 20 | |
Section: 21 | |
County/Municipality: Starland County | |
Well Name: BEARSPAW ET AL DRUM 1-21-29-20 | |
Operator Name: Bearspaw Petroleum Ltd. | |
License Number: 0146426 | |
License Date: 1990-11-21 | |
License Status: RecCertified | |
Spud Date: 1990-11-25 | |
Final Drill Date: 1990-12-16 | |
Well Total Depth: 1732.00 m | |
Surface Hole Latitude: 51.492398 | |
Surface Hole Longitude: -112.744629 |
Date | Event |
---|---|
1990-11-21 | Obtained License |
1990-11-26 | Surface Casing Operation Performed |
1990-11-28 | Direction Drilling Operation Performed - Deviate |
1990-12-16 | Finished Drilling |
1990-12-16 | Well Mode changed to Drilled and Cased |
1990-12-18 | Well Log Performed |
1990-12-19 | Production Casing Operation Performed |
1990-12-19 | Well Log Performed |
1990-12-20 | Rig Released |
1990-12-23 | Perforation Treatment Performed - Jet Perforation |
1990-12-23 | Well Log Performed |
1990-12-26 | Well Began Production |
1990-12-26 | Well Fluid changed to Crude Oil |
1990-12-26 | Well Mode changed to Flowing |
1991-06-20 | Well Fluid changed to Crude Oil |
1991-06-20 | Well Mode changed to Pumping |
2003-12-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-12-31 | Plug Back Performed |
2003-12-31 | Well Fluid changed to Crude Oil |
2003-12-31 | Well Mode changed to Abandoned Zone |
2004-01-06 | Well Abandoned |
2004-01-06 | Well Fluid changed to Crude Oil |
2004-01-06 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1990-11-28 | 549.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-12-23 | Perforation | 1687.30 | 1689.00 | 13 |
2003-12-31 | Packing Device Capped w/Cement | 1672.00 | 1680.00 | 0 |
2003-12-31 | Packing Device Capped w/Cement | 327.00 | 335.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 94 | 0.0 | 0.0 | 0.0 |
1991 | 8149 | 0.0 | 0.0 | 0.0 |
1992 | 8669 | 0.0 | 0.0 | 0.0 |
1993 | 8564 | 0.0 | 0.0 | 0.0 |
1994 | 8608 | 0.0 | 0.0 | 0.0 |
1995 | 2909 | 0.0 | 0.0 | 0.0 |
1997 | 7447 | 0.0 | 0.0 | 0.0 |
1998 | 6646 | 0.0 | 0.0 | 0.0 |
1999 | 8336 | 0.0 | 0.0 | 0.0 |
2000 | 5725 | 0.0 | 0.0 | 0.0 |
2001 | 8431 | 0.0 | 0.0 | 0.0 |
2002 | 5919 | 0.0 | 0.0 | 0.0 |
For data sources see[6]