X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294201312000

Well Details

Well ID: 0294201312000
Loading map...
Location: 00/12-13-029-20W4/0
Location Alias: 00/12-13-29-20 W4M
Location Alias 2: 00/12-13-029-20 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 20
Section: 13
County/Municipality: Starland County
Well Name: BEARSPAW ET AL DRUM 12-13-29-20
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0022769
License Date: 1962-07-26
License Status: Abandoned
Spud Date: 1962-09-18
Final Drill Date: 1962-10-10
Well Total Depth: 1624.00 m
Surface Hole Latitude: 51.483318
Surface Hole Longitude: -112.697090

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-07-26 Obtained License
1962-09-25 Drill Stem Test Performed
1962-10-09 Drill Stem Test Performed
1962-10-10 Finished Drilling
1962-10-10 Well Mode changed to Drilled and Cased
1962-10-12 Production Casing Operation Performed
1962-11-01 Perforation Treatment Performed - Jet Perforation
1962-11-05 Perforation Treatment Performed - Acid Wash - No Pressure
1962-11-10 Well Began Production
1962-11-10 Well Fluid changed to Crude Oil
1962-11-10 Well Mode changed to Flowing
1973-01-16 Well Fluid changed to Crude Oil
1973-01-16 Well Mode changed to Pumping
1982-07-23 Well Fluid changed to Crude Oil
1982-07-23 Well Mode changed to Suspended
2004-06-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-06-29 Perforation Treatment Performed - Jet Perforation
2004-06-29 Plug Back Performed
2004-06-29 Well Fluid changed to Crude Oil
2004-06-29 Well Mode changed to Abandoned Zone
2004-07-14 Perforation Treatment Performed - Remedial Casing
2004-11-02 Well Abandoned
2004-11-02 Well Fluid changed to Crude Oil
2004-11-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-11-01 Perforation 1570.60 1574.00 13
1962-11-05 Acid Wash 1570.60 1574.00 0
2004-06-29 Packing Device Capped w/Cement 1552.00 1560.00 0
2004-06-29 Perforation 325.00 325.50 8
2004-07-14 Remedial Casing Cementing 325.00 325.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1973 6341 0.0 0.0 0.0
1974 8178 0.0 0.0 0.0
1975 2112 0.0 0.0 0.0

For data sources see[5]

References