X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294192903020

Well Details

Well ID: 0294192903020
Loading map...
Location: 02/03-29-029-19W4/0
Location Alias: 02/03-29-29-19 W4M
Location Alias 2: 02/03-29-029-19 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 19
Section: 29
County/Municipality: Starland County
Well Name: SIRIUS 102 DRUM 3-29-29-19
Operator Name: AQT Water Management Inc.
License Number: 0192665
License Date: 1996-10-25
License Status: Issued
Spud Date: 1996-10-28
Final Drill Date: 1996-11-07
Well Total Depth: 1690.00 m
Surface Hole Latitude: 51.506548
Surface Hole Longitude: -112.640401

For data sources see[1][2]

Well History

Date Event
1996-10-25 Obtained License
1996-10-29 Surface Casing Operation Performed
1996-10-30 Direction Drilling Operation Performed - Deviate
1996-11-04 Well Log Performed
1996-11-05 Intermediate Casing Operation Performed
1996-11-07 Finished Drilling
1996-11-07 Well Mode changed to Drilled and Cased
1996-11-08 Well Log Performed
1996-11-09 Liner Casing Operation Performed
1996-11-09 Rig Released
1996-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-26 Perforation Treatment Performed - Jet Perforation
1996-11-26 Well Log Performed
1996-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-28 Perforation Treatment Performed - Jet Perforation
1996-12-01 Well Began Production
1996-12-01 Well Fluid changed to Crude Oil
1996-12-01 Well Mode changed to Pumping
1997-12-07 Perforation Treatment Performed - Cement Squeeze
1997-12-10 Perforation Treatment Performed - Jet Perforation
1997-12-10 Well Log Performed
1997-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-11 Well Log Performed
1998-09-11 Well Fluid changed to Crude Oil
1998-09-11 Well Mode changed to Suspended
1999-04-01 Well Began Injection
1999-04-01 Well Fluid changed to Water
1999-04-01 Well Type changed to Injection
2010-11-01 Well Fluid changed to Water
2010-11-01 Well Mode changed to Suspended
2010-11-01 Well Type changed to Injection
2014-10-01 Well Fluid changed to Water
2014-10-01 Well Type changed to Disposal

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-10-30 419.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-11-26 Perforation 1644.00 1648.00 13
1996-11-26 Acid Treatment 1644.00 1648.00 0
1996-11-28 Perforation 1648.00 1651.00 13
1996-11-28 Acid Treatment 1644.00 1651.00 0
1997-12-07 Cement Squeeze 1644.00 1651.00 0
1997-12-10 Perforation 1652.50 1656.00 13
1997-12-11 Acid Treatment 1652.50 1656.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 667 0.0 0.0 0.0
1997 7285 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

References