If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294190403020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.46168,"lon":-112.619675,"icon":""}]} |
Location: 02/03-04-029-19W4/0 | |
Location Alias: 02/03-04-29-19 W4M | |
Location Alias 2: 02/03-04-029-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 19 | |
Section: 04 | |
County/Municipality: Starland County | |
Well Name: TEMPUS WAYNE 3-4-29-19 | |
Operator Name: Tempus Energy Ltd. | |
License Number: 0430005 | |
License Date: 2011-01-14 | |
License Status: Issued | |
Spud Date: 2011-03-12 | |
Final Drill Date: 2011-03-28 | |
Well Total Depth: 2719.00 m | |
Surface Hole Latitude: 51.461680 | |
Surface Hole Longitude: -112.619675 |
Date | Event |
---|---|
2011-01-14 | Obtained License |
2011-03-18 | Surface Casing Operation Performed |
2011-03-23 | Direction Drilling Operation Performed - Horizontal |
2011-03-28 | Finished Drilling |
2011-03-28 | Well Mode changed to Drilled and Cased |
2011-03-29 | Production Casing Operation Performed |
2011-03-30 | Rig Released |
2011-05-18 | Well Log Performed |
2011-05-21 | Perforation Treatment Performed - Jet Perforation |
2011-05-29 | Perforation Treatment Performed - Fractured |
2011-05-31 | Perforation Treatment Performed - Jet Perforation |
2011-06-01 | Perforation Treatment Performed - Fractured |
2011-06-02 | Perforation Treatment Performed - Jet Perforation |
2011-06-03 | Perforation Treatment Performed - Fractured |
2011-06-03 | Perforation Treatment Performed - Jet Perforation |
2011-06-04 | Perforation Treatment Performed - Fractured |
2011-06-06 | Perforation Treatment Performed - Jet Perforation |
2011-06-07 | Perforation Treatment Performed - Fractured |
2011-06-07 | Perforation Treatment Performed - Jet Perforation |
2011-06-08 | Perforation Treatment Performed - Fractured |
2011-06-09 | Well Began Production |
2011-06-09 | Well Fluid changed to Crude Oil |
2011-06-09 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-03-23 | 1007.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-05-21 | Perforation | 2690.00 | 2690.60 | 3 |
2011-06-03 | Fracture | 2325.00 | 2325.60 | 0 |
2011-06-03 | Perforation | 2230.00 | 2230.60 | 3 |
2011-06-03 | Perforation | 2135.00 | 2135.60 | 3 |
2011-06-04 | Fracture | 2230.00 | 2230.60 | 0 |
2011-06-04 | Fracture | 2135.00 | 2135.60 | 0 |
2011-06-06 | Perforation | 2025.00 | 2025.60 | 3 |
2011-06-06 | Perforation | 1945.00 | 1945.60 | 3 |
2011-06-07 | Fracture | 2025.00 | 2025.60 | 0 |
2011-06-07 | Fracture | 1945.00 | 1945.60 | 0 |
2011-06-07 | Perforation | 1860.00 | 1860.60 | 3 |
2011-05-29 | Fracture | 2690.00 | 2690.60 | 0 |
2011-06-07 | Perforation | 1760.00 | 1760.60 | 3 |
2011-06-08 | Fracture | 1860.00 | 1860.60 | 0 |
2011-06-08 | Fracture | 1760.00 | 1760.60 | 0 |
2011-05-31 | Perforation | 2615.00 | 2615.60 | 3 |
2011-05-31 | Perforation | 2525.00 | 2525.60 | 3 |
2011-06-01 | Fracture | 2615.00 | 2615.60 | 0 |
2011-06-01 | Fracture | 2525.00 | 2525.60 | 0 |
2011-06-02 | Perforation | 2415.00 | 2415.60 | 3 |
2011-06-02 | Perforation | 2325.00 | 2325.60 | 3 |
2011-06-03 | Fracture | 2415.00 | 2415.60 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 3760 | 0.0 | 0.0 | 0.0 |
2012 | 6621 | 0.0 | 0.0 | 0.0 |
2013 | 6932 | 0.0 | 0.0 | 0.0 |
2014 | 8096 | 0.0 | 0.0 | 0.0 |
2015 | 7699 | 0.0 | 0.0 | 0.0 |
2016 | 6361 | 0.0 | 0.0 | 0.0 |
2017 | 5269 | 0.0 | 0.0 | 0.0 |
2018 | 5742 | 0.0 | 0.0 | 0.0 |
2019 | 8671 | 0.0 | 0.0 | 0.0 |
2020 | 2133 | 0.0 | 0.0 | 0.0 |
For data sources see[6]