X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294180312002

Well Details

Well ID: 0294180312002
Loading map...
Location: 00/12-03-029-18W4/2
Location Alias: 00/12-03-29-18 W4M
Location Alias 2: 00/12-03-029-18 W4/02
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 18
Section: 03
County/Municipality: Starland County
Well Name: EOG AERIAL 12-3-29-18
Operator Name: Canadian Natural Resources Limited
License Number: 0145722
License Date: 1990-10-05
License Status: Suspension
Spud Date: 1990-10-18
Final Drill Date: 1990-10-21
Well Total Depth: 1346.00 m
Surface Hole Latitude: 51.455195
Surface Hole Longitude: -112.461002

For data sources see[1][2]

Well History

Date Event
1990-10-05 Obtained License
1990-10-18 Surface Casing Operation Performed
1990-10-21 Finished Drilling
1990-10-21 Well Mode changed to Drilled and Cased
1990-10-22 Drill Stem Test Performed
1990-10-22 Well Log Performed
1990-10-23 Production Casing Operation Performed
1990-10-23 Rig Released
1990-11-03 Perforation Treatment Performed - Jet Perforation
1990-11-03 Well Log Performed
1990-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-11-04 Perforation Treatment Performed - Jet Perforation
1990-11-04 Plug Back Performed
1990-11-04 Well Log Performed
1990-11-05 Perforation Treatment Performed - Fractured
2005-05-14 Perforation Treatment Performed - Jet Perforation
2005-05-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-21 Plug Back Performed
2005-05-21 Well Log Performed
2005-05-26 Perforation Treatment Performed - Jet Perforation
2005-05-26 Well Log Performed
2005-05-30 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-11-03 Perforation 1299.00 1303.00 13
1990-11-04 Packing Device Capped w/Cement 1297.20 1298.00 0
1990-11-04 Perforation 1289.00 1292.00 13
1990-11-05 Fracture 1289.00 1292.00 0
2005-05-14 Perforation 1015.50 1020.00 17
2005-05-21 Packing Device Capped w/Cement 1271.00 1279.00 0
2005-05-26 Perforation 777.50 781.50 13
2005-05-30 Fracture 777.50 781.50 0

For data sources see[4]



References