X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294170101002

Well Details

Well ID: 0294170101002
Loading map...
Location: 00/01-01-029-17W4/2
Location Alias: 00/01-01-29-17 W4M
Location Alias 2: 00/01-01-029-17 W4/02
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 17
Section: 01
County/Municipality: Starland County
Well Name: SOC MICHI 1-1-29-17
Operator Name: AlphaBow Energy Ltd.
License Number: 0246055
License Date: 2000-12-06
License Status: Issued
Spud Date: 2000-12-14
Final Drill Date: 2000-12-22
Well Total Depth: 1491.00 m
Surface Hole Latitude: 51.449375
Surface Hole Longitude: -112.260344

For data sources see[1][2]

Well History

Date Event
2000-12-06 Obtained License
2000-12-14 Surface Casing Operation Performed
2000-12-18 Direction Drilling Operation Performed - Deviate
2000-12-22 Finished Drilling
2000-12-22 Well Log Performed
2000-12-22 Well Mode changed to Drilled and Cased
2000-12-23 Production Casing Operation Performed
2000-12-23 Rig Released
2001-01-19 Perforation Treatment Performed - Jet Perforation
2001-01-20 Perforation Treatment Performed - Fractured
2001-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-13 Perforation Treatment Performed - Jet Perforation
2001-02-13 Plug Back Performed
2001-02-13 Well Mode changed to Drilled and Cased
2001-02-14 Perforation Treatment Performed - Fractured
2001-02-18 Well Began Production
2001-02-18 Well Fluid changed to Gas
2001-02-18 Well Mode changed to Flowing
2016-01-01 Well Fluid changed to Gas
2016-01-01 Well Mode changed to Pumping
2018-05-31 Well Fluid changed to Gas
2018-05-31 Well Mode changed to Suspended
2018-12-01 Well Fluid changed to Gas
2018-12-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-12-18 606.50 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-01-19 Perforation 1471.00 1473.00 20
2001-01-19 Perforation 1458.00 1460.00 20
2001-01-20 Fracture 1458.00 1473.00 0
2001-02-13 Packing Device Capped w/Cement 1444.00 1452.00 0
2001-02-13 Perforation 1423.00 1426.00 20
2001-02-13 Perforation 1427.00 1433.00 20
2001-02-14 Fracture 1423.00 1433.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 7356 0.0 0.0 0.0
2002 8671 0.0 0.0 0.0
2003 8419 0.0 0.0 0.0
2004 8395 0.0 0.0 0.0
2005 8729 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8745 0.0 0.0 0.0
2009 8609 0.0 0.0 0.0
2010 7925 0.0 0.0 0.0
2011 6249 0.0 0.0 0.0
2012 4336 0.0 0.0 0.0
2013 1616 0.0 0.0 0.0
2014 5865 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8567 0.0 0.0 0.0
2018 2136 0.0 0.0 0.0
2019 5399 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References