X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294112206000

Well Details

Well ID: 0294112206000
Loading map...
Location: 00/06-22-029-11W4/0
Location Alias: 00/06-22-29-11 W4M
Location Alias 2: 00/06-22-029-11 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 11
Section: 22
County/Municipality: Special Areas No. 2
Well Name: EBOC ET AL STANMORE 6-22-29-11
Operator Name: Enerplus Corporation
License Number: 0084804
License Date: 1980-08-08
License Status: Re-Entered
Spud Date: 1980-08-26
Final Drill Date: 1980-09-01
Well Total Depth: 1091.00 m
Surface Hole Latitude: 51.495597
Surface Hole Longitude: -111.475003

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-08-08 Obtained License
1980-09-01 Finished Drilling
1980-09-02 Drill Stem Test Performed
1980-09-03 Drill Stem Test Performed
1980-09-04 Production Casing Operation Performed
1980-09-16 Perforation Treatment Performed - Jet Perforation
1980-10-10 Well Mode changed to Drilled and Cased
1981-12-14 Well Began Production
1981-12-14 Well Fluid changed to Gas
1981-12-14 Well Mode changed to Flowing
1985-05-09 Well Fluid changed to Gas
1985-05-09 Well Mode changed to Suspended
1994-02-03 Perforation Treatment Performed - Jet Perforation
1994-02-03 Well Log Performed
1998-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-29 Plug Back Performed
1998-09-29 Well Fluid changed to Gas
1998-09-29 Well Mode changed to Abandoned Zone
1998-10-01 Well Abandoned
1998-10-01 Well Fluid changed to Gas
1998-10-01 Well Mode changed to Abandoned
1998-10-02 Well Fluid changed to Gas
1998-10-02 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-16 Perforation 1041.00 1042.00 6
1994-02-03 Perforation 1057.00 1058.00 13
1994-02-03 Perforation 1060.50 1061.50 13
1998-09-29 Packing Device Capped w/Cement 1044.40 1052.40 0
1998-09-29 Packing Device Capped w/Cement 1024.50 1032.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 94 0.0 0.0 0.0
1982 2411 0.0 0.0 0.0
1983 3087 0.0 0.0 0.0
1984 36 0.0 0.0 0.0

For data sources see[5]

References