X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294091506002

Well Details

Well ID: 0294091506002
Loading map...
Location: 00/06-15-029-09W4/2
Location Alias: 00/06-15-29-09 W4M
Location Alias 2: 00/06-15-029-09 W4/02
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 09
Section: 15
County/Municipality: Special Areas No. 3
Well Name: ARCHER GULF DOBSON 6-15-29-9
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0058336
License Date: 1976-05-26
License Status: RecCertified
Spud Date: 1976-05-27
Final Drill Date: 1976-05-31
Well Total Depth: 1051.60 m
Surface Hole Latitude: 51.481202
Surface Hole Longitude: -111.193687

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-05-26 Obtained License
1976-05-31 Drill Stem Test Performed
1976-05-31 Finished Drilling
1976-06-01 Drill Stem Test Performed
1976-06-01 Production Casing Operation Performed
1976-06-24 Perforation Treatment Performed - Jet Perforation
1976-06-24 Well Mode changed to Drilled and Cased
1979-07-03 Well Began Production
1979-07-03 Well Fluid changed to Gas
1979-07-03 Well Mode changed to Flowing
1993-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-01-16 Perforation Treatment Performed - Jet Perforation
1993-01-16 Plug Back Performed
1993-01-16 Well Fluid changed to Gas
1993-01-16 Well Mode changed to Abandoned Zone
1993-07-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-07-02 Plug Back Performed
1993-07-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-06-24 Perforation 345.30 347.50 13
1976-06-24 Perforation 861.10 862.00 13
1993-01-16 Packing Device Capped w/Cement 817.00 825.00 0
1993-01-16 Packing Device Capped w/Cement 332.00 340.00 0
1993-01-16 Perforation 288.30 289.00 13
1993-07-02 Packing Device Capped w/Cement 277.00 285.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 696 0.0 0.0 0.0
1980 1517 0.0 0.0 0.0
1981 2755 0.0 0.0 0.0
1982 3175 0.0 0.0 0.0
1983 1100 0.0 0.0 0.0
1984 2325 0.0 0.0 0.0
1985 1635 0.0 0.0 0.0
1986 1564 0.0 0.0 0.0
1987 4456 0.0 0.0 0.0
1988 4008 0.0 0.0 0.0
1989 1190 0.0 0.0 0.0
1990 3896 0.0 0.0 0.0
1991 4491 0.0 0.0 0.0
1992 6951 0.0 0.0 0.0

For data sources see[5]

References