X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294030410003

Well Details

Well ID: 0294030410003
Loading map...
Location: 00/10-04-029-03W4/3
Location Alias: 00/10-04-29-03 W4M
Location Alias 2: 00/10-04-029-03 W4/03
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 03
Section: 04
County/Municipality: Special Areas No. 3
Well Name: PERL MORGAN OYEN 10-4-29-3
Operator Name: Obsidian Energy Ltd.
License Number: 0135577
License Date: 1988-08-16
License Status: Abandoned
Spud Date: 1988-08-20
Final Drill Date: 1988-08-24
Well Total Depth: 985.00 m
Surface Hole Latitude: 51.455758
Surface Hole Longitude: -110.366667

For data sources see[1][2]

Well History

Date Event
1988-08-16 Obtained License
1988-08-21 Surface Casing Operation Performed
1988-08-24 Finished Drilling
1988-08-24 Well Mode changed to Drilled and Cased
1988-08-25 Drill Stem Test Performed
1988-08-25 Well Log Performed
1988-08-26 Drill Stem Test Performed
1988-08-27 Drill Stem Test Performed
1988-08-28 Production Casing Operation Performed
1988-08-28 Rig Released
1988-09-15 Well Log Performed
1988-09-16 Perforation Treatment Performed - Jet Perforation
1988-09-16 Well Log Performed
1989-09-07 Perforation Treatment Performed - Jet Perforation
1989-09-07 Well Log Performed
1989-09-09 Perforation Treatment Performed - Cement Squeeze
1989-09-09 Plug Back Performed
1989-09-10 Perforation Treatment Performed - Jet Perforation
1989-09-10 Well Log Performed
1990-03-28 Well Log Performed
1990-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-29 Plug Back Performed
1990-04-01 Perforation Treatment Performed - Chemical Squeeze
1992-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-06-03 Perforation Treatment Performed - Jet Perforation
1992-06-03 Plug Back Performed
1992-06-03 Well Log Performed
1992-06-04 Perforation Treatment Performed - Remedial Casing
1992-06-05 Perforation Treatment Performed - Jet Perforation
1992-06-05 Well Log Performed
1992-07-21 Well Began Production
1992-07-21 Well Fluid changed to Gas
1992-07-21 Well Mode changed to Flowing
1992-07-29 Well Fluid changed to Gas
1992-07-29 Well Mode changed to Suspended
1994-09-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-03 Plug Back Performed
1994-09-03 Well Abandoned
1994-09-03 Well Fluid changed to Gas
1994-09-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-16 Perforation 902.30 905.80 13
1992-06-05 Perforation 257.00 257.50 13
1994-09-03 Packing Device Capped w/Cement 242.00 250.00 0
1989-09-07 Perforation 942.00 947.00 13
1989-09-09 Cement Squeeze 902.30 947.00 0
1989-09-10 Perforation 789.00 790.50 20
1990-03-29 Packing Device Capped w/Cement 837.00 845.00 0
1990-04-01 Chemical Squeeze 789.00 790.50 0
1992-06-03 Packing Device Capped w/Cement 775.00 783.00 0
1992-06-03 Perforation 298.00 299.00 13
1992-06-04 Remedial Casing Cementing 298.00 299.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 138 0.0 0.0 0.0

For data sources see[5]

References