If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284281814000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.40055,"lon":-113.934653,"icon":""}]} |
Location: 00/14-18-028-28W4/0 | |
Location Alias: 00/14-18-28-28 W4M | |
Location Alias 2: 00/14-18-028-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 28 | |
Section: 18 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSSE 14-18-28-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411324 | |
License Date: 2009-07-07 | |
License Status: Amended | |
Spud Date: 2009-12-16 | |
Final Drill Date: 2010-01-28 | |
Well Total Depth: 1356.00 m | |
Surface Hole Latitude: 51.400550 | |
Surface Hole Longitude: -113.934653 |
Date | Event |
---|---|
2009-07-07 | Obtained License |
2009-12-16 | Surface Casing Operation Performed |
2010-01-28 | Finished Drilling |
2010-01-28 | Well Mode changed to Drilled and Cased |
2010-01-29 | Production Casing Operation Performed |
2010-01-29 | Rig Released |
2010-02-02 | Well Log Performed |
2010-02-20 | Perforation Treatment Performed - Jet Perforation |
2011-03-08 | Perforation Treatment Performed - Jet Perforation |
2012-01-19 | Perforation Treatment Performed - Jet Perforation |
2012-02-08 | Perforation Treatment Performed - Fractured |
2012-02-10 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-10 | Well Mode changed to Testing |
2012-03-11 | Well Began Production |
2012-03-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-03-11 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-20 | Perforation | 1273.50 | 1274.00 | 13 |
2012-01-19 | Perforation | 533.00 | 535.00 | 13 |
2012-01-19 | Perforation | 545.00 | 546.00 | 13 |
2012-01-19 | Perforation | 554.00 | 555.00 | 13 |
2012-01-19 | Perforation | 560.00 | 563.00 | 13 |
2012-01-19 | Perforation | 570.00 | 573.00 | 13 |
2012-01-19 | Perforation | 583.00 | 584.00 | 13 |
2012-01-19 | Perforation | 617.00 | 619.00 | 13 |
2012-01-19 | Perforation | 638.00 | 639.00 | 13 |
2012-01-19 | Perforation | 645.00 | 648.00 | 13 |
2012-01-19 | Perforation | 676.00 | 679.00 | 13 |
2011-03-08 | Perforation | 1041.00 | 1043.00 | 13 |
2012-01-19 | Perforation | 686.00 | 689.00 | 13 |
2012-01-19 | Perforation | 707.00 | 709.00 | 13 |
2012-01-19 | Perforation | 722.00 | 725.00 | 13 |
2012-01-19 | Perforation | 739.00 | 741.00 | 13 |
2012-01-19 | Perforation | 745.00 | 747.00 | 13 |
2012-01-19 | Perforation | 761.00 | 764.00 | 13 |
2012-01-19 | Perforation | 786.70 | 787.20 | 13 |
2012-01-19 | Perforation | 826.00 | 827.00 | 13 |
2012-01-19 | Perforation | 859.00 | 861.00 | 13 |
2012-01-19 | Perforation | 865.70 | 866.70 | 13 |
2011-03-08 | Perforation | 1142.50 | 1145.50 | 13 |
2012-01-19 | Perforation | 871.00 | 873.00 | 13 |
2012-01-19 | Perforation | 883.90 | 884.90 | 13 |
2012-01-19 | Perforation | 915.70 | 916.20 | 13 |
2012-01-19 | Perforation | 918.50 | 919.00 | 13 |
2012-01-19 | Perforation | 921.10 | 923.10 | 13 |
2012-01-19 | Perforation | 923.90 | 924.40 | 13 |
2012-01-19 | Perforation | 937.00 | 938.00 | 13 |
2012-01-19 | Perforation | 938.80 | 939.30 | 13 |
2012-01-19 | Perforation | 951.60 | 952.10 | 13 |
2012-01-19 | Perforation | 956.70 | 957.20 | 13 |
2011-03-08 | Perforation | 1155.00 | 1156.00 | 13 |
2012-02-08 | Fracture | 446.00 | 957.20 | 0 |
2011-03-08 | Perforation | 1165.00 | 1168.00 | 13 |
2011-03-08 | Perforation | 1219.00 | 1221.00 | 13 |
2012-01-19 | Perforation | 446.00 | 449.00 | 13 |
2012-01-19 | Perforation | 520.00 | 522.00 | 13 |
2012-01-19 | Perforation | 526.00 | 529.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7200 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8747 | 0.0 | 0.0 | 0.0 |
2015 | 8742 | 0.0 | 0.0 | 0.0 |
2016 | 8760 | 0.0 | 0.0 | 0.0 |
2017 | 8677 | 0.0 | 0.0 | 0.0 |
2018 | 8400 | 0.0 | 0.0 | 0.0 |
2019 | 8660 | 0.0 | 0.0 | 0.0 |
2020 | 2178 | 0.0 | 0.0 | 0.0 |
For data sources see[5]