X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284253611022

Well Details

Well ID: 0284253611022
Loading map...
Location: 02/11-36-028-25W4/2
Location Alias: 02/11-36-28-25 W4M
Location Alias 2: 02/11-36-028-25 W4/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 36
County/Municipality: Rocky View County
Well Name: EMBER 102 ENTICE 11-36-28-25
Operator Name: Ember Resources Inc.
License Number: 0298388
License Date: 2003-12-09
License Status: Issued
Spud Date: 2003-12-18
Final Drill Date: 2003-12-18
Well Total Depth: 721.00 m
Surface Hole Latitude: 51.438201
Surface Hole Longitude: -113.395703

For data sources see[1][2]

Well History

Date Event
2003-12-09 Obtained License
2003-12-14 Surface Casing Operation Performed
2003-12-18 Finished Drilling
2003-12-18 Well Mode changed to Drilled and Cased
2003-12-19 Production Casing Operation Performed
2003-12-19 Rig Released
2004-01-09 Well Log Performed
2004-01-20 Perforation Treatment Performed - Jet Perforation
2004-02-04 Perforation Treatment Performed - Jet Perforation
2004-03-07 Perforation Treatment Performed - Jet Perforation
2004-05-30 Perforation Treatment Performed - Fractured
2004-06-26 Well Fluid changed to Gas
2004-06-26 Well Mode changed to Testing
2004-08-13 Well Began Production
2004-08-13 Well Fluid changed to Coalbed Methane-Coals Only
2004-08-13 Well Mode changed to Flowing
2017-03-30 Well Fluid changed to Coalbed Methane-Coals Only
2017-03-30 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-01-20 Perforation 636.00 639.00 13
2004-03-07 Perforation 529.30 529.90 13
2004-03-07 Perforation 521.90 522.50 13
2004-03-07 Perforation 517.50 518.10 13
2004-03-07 Perforation 494.60 495.20 13
2004-03-07 Perforation 481.60 482.20 13
2004-03-07 Perforation 480.90 481.50 13
2004-03-07 Perforation 473.60 474.20 13
2004-03-07 Perforation 469.00 469.50 13
2004-03-07 Perforation 464.90 465.50 13
2004-03-07 Perforation 444.20 444.80 13
2004-02-04 Perforation 590.50 593.50 13
2004-03-07 Perforation 437.50 438.10 13
2004-03-07 Perforation 434.10 434.70 13
2004-03-07 Perforation 428.40 429.00 13
2004-03-07 Perforation 418.70 419.30 13
2004-03-07 Perforation 418.10 418.70 13
2004-03-07 Perforation 417.30 417.90 13
2004-03-07 Perforation 325.40 326.00 13
2004-03-07 Perforation 320.90 321.50 13
2004-03-07 Perforation 245.60 246.20 13
2004-03-07 Perforation 201.30 201.90 13
2004-03-07 Perforation 585.40 586.00 13
2004-05-30 Fracture 201.30 586.00 0
2004-03-07 Perforation 568.90 569.50 13
2004-03-07 Perforation 562.50 563.10 13
2004-03-07 Perforation 555.40 556.00 13
2004-03-07 Perforation 549.90 550.50 13
2004-03-07 Perforation 542.70 543.30 13
2004-03-07 Perforation 534.50 535.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 2902 0.0 0.0 0.0
2005 8678 0.0 0.0 0.0
2006 8728 0.0 0.0 0.0
2007 8615 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8704 0.0 0.0 0.0
2011 8673 0.0 0.0 0.0
2012 8762 0.0 0.0 0.0
2013 8719 0.0 0.0 0.0
2014 8594 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8600 0.0 0.0 0.0
2017 8575 0.0 0.0 0.0
2018 8671 0.0 0.0 0.0
2019 8507 0.0 0.0 0.0
2020 2128 0.0 0.0 0.0

For data sources see[5]

References