X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284253009000

Well Details

Well ID: 0284253009000
Loading map...
Location: 00/09-30-028-25W4/0
Location Alias: 00/09-30-28-25 W4M
Location Alias 2: 00/09-30-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 30
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 9-30-28-25
Operator Name: Ember Resources Inc.
License Number: 0292643
License Date: 2003-09-10
License Status: Issued
Spud Date: 2003-09-27
Final Drill Date: 2003-09-28
Well Total Depth: 762.00 m
Surface Hole Latitude: 51.426686
Surface Hole Longitude: -113.498367

For data sources see[1][2]

Well History

Date Event
2003-09-10 Obtained License
2003-09-14 Conductor Casing Operation Performed
2003-09-28 Finished Drilling
2003-09-28 Production Casing Operation Performed
2003-09-28 Rig Released
2003-09-28 Well Mode changed to Drilled and Cased
2003-10-10 Well Log Performed
2003-11-09 Perforation Treatment Performed - Jet Perforation
2003-11-22 Perforation Treatment Performed - Fractured
2004-05-14 Well Began Production
2004-05-14 Well Fluid changed to Coalbed Methane-Coals Only
2004-05-14 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-11-09 Perforation 638.00 639.00 13
2003-11-09 Perforation 580.50 581.50 13
2003-11-09 Perforation 576.10 577.10 13
2003-11-09 Perforation 566.60 569.60 13
2003-11-09 Perforation 545.70 546.70 13
2003-11-09 Perforation 539.80 540.80 13
2003-11-09 Perforation 537.20 538.20 13
2003-11-09 Perforation 527.90 528.90 13
2003-11-09 Perforation 522.20 523.20 13
2003-11-09 Perforation 515.20 516.20 13
2003-11-09 Perforation 496.60 497.60 13
2003-11-09 Perforation 634.90 635.90 13
2003-11-09 Perforation 490.10 491.10 13
2003-11-09 Perforation 487.20 488.20 13
2003-11-09 Perforation 484.60 485.60 13
2003-11-09 Perforation 472.70 473.70 13
2003-11-09 Perforation 364.70 365.70 13
2003-11-09 Perforation 353.60 354.60 13
2003-11-09 Perforation 288.60 289.60 13
2003-11-09 Perforation 243.20 244.20 13
2003-11-09 Perforation 234.60 235.60 13
2003-11-22 Fracture 234.60 639.00 0
2003-11-09 Perforation 630.90 631.90 13
2003-11-09 Perforation 618.60 619.60 13
2003-11-09 Perforation 610.20 612.20 13
2003-11-09 Perforation 602.80 603.80 13
2003-11-09 Perforation 601.50 602.50 13
2003-11-09 Perforation 592.90 593.90 13
2003-11-09 Perforation 591.80 592.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 5480 0.0 0.0 0.0
2005 8678 0.0 0.0 0.0
2006 8728 0.0 0.0 0.0
2007 8615 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8704 0.0 0.0 0.0
2011 8673 0.0 0.0 0.0
2012 8762 0.0 0.0 0.0
2013 8720 0.0 0.0 0.0
2014 8594 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8600 0.0 0.0 0.0
2017 8575 0.0 0.0 0.0
2018 8671 0.0 0.0 0.0
2019 8507 0.0 0.0 0.0
2020 2128 0.0 0.0 0.0

For data sources see[5]

References