If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284253008000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.418507,"lon":-113.505616,"icon":""}]} |
Location: 00/08-30-028-25W4/0 | |
Location Alias: 00/08-30-28-25 W4M | |
Location Alias 2: 00/08-30-028-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 25 | |
Section: 30 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 8-30-28-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0438936 | |
License Date: 2011-11-15 | |
License Status: Issued | |
Spud Date: 2012-01-11 | |
Final Drill Date: 2012-01-13 | |
Well Total Depth: 1223.00 m | |
Surface Hole Latitude: 51.418507 | |
Surface Hole Longitude: -113.505616 |
Date | Event |
---|---|
2011-11-15 | Obtained License |
2012-01-11 | Direction Drilling Operation Performed - Deviate |
2012-01-12 | Surface Casing Operation Performed |
2012-01-13 | Finished Drilling |
2012-01-13 | Production Casing Operation Performed |
2012-01-13 | Rig Released |
2012-01-13 | Well Mode changed to Drilled and Cased |
2012-01-21 | Well Log Performed |
2012-02-02 | Perforation Treatment Performed - Jet Perforation |
2012-02-10 | Perforation Treatment Performed - Fractured |
2012-02-16 | Perforation Treatment Performed - Jet Perforation |
2012-02-19 | Perforation Treatment Performed - Fractured |
2012-02-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-20 | Well Mode changed to Testing |
2012-03-12 | Well Began Production |
2012-03-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-03-12 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-11 | Precision Drilling Corporation | 239 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-11 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-02 | Perforation | 324.00 | 327.00 | 13 |
2012-02-16 | Perforation | 318.30 | 319.80 | 13 |
2012-02-16 | Perforation | 384.30 | 384.80 | 13 |
2012-02-16 | Perforation | 392.00 | 393.00 | 13 |
2012-02-16 | Perforation | 478.80 | 479.30 | 13 |
2012-02-16 | Perforation | 505.00 | 505.50 | 13 |
2012-02-16 | Perforation | 516.00 | 516.50 | 13 |
2012-02-16 | Perforation | 635.00 | 638.00 | 13 |
2012-02-16 | Perforation | 643.50 | 646.00 | 13 |
2012-02-16 | Perforation | 655.00 | 658.00 | 13 |
2012-02-16 | Perforation | 671.60 | 673.10 | 13 |
2012-02-02 | Perforation | 624.00 | 627.00 | 13 |
2012-02-16 | Perforation | 676.10 | 677.10 | 13 |
2012-02-16 | Perforation | 691.00 | 691.50 | 13 |
2012-02-16 | Perforation | 717.20 | 717.70 | 13 |
2012-02-16 | Perforation | 721.60 | 723.60 | 13 |
2012-02-16 | Perforation | 729.80 | 730.30 | 13 |
2012-02-16 | Perforation | 741.00 | 741.50 | 13 |
2012-02-16 | Perforation | 746.20 | 746.70 | 13 |
2012-02-16 | Perforation | 751.20 | 752.20 | 13 |
2012-02-16 | Perforation | 774.40 | 776.90 | 13 |
2012-02-16 | Perforation | 783.90 | 784.40 | 13 |
2012-02-02 | Perforation | 668.50 | 669.50 | 13 |
2012-02-16 | Perforation | 789.80 | 790.80 | 13 |
2012-02-16 | Perforation | 795.00 | 796.00 | 13 |
2012-02-16 | Perforation | 800.10 | 801.60 | 13 |
2012-02-16 | Perforation | 810.20 | 810.70 | 13 |
2012-02-16 | Perforation | 817.60 | 818.10 | 13 |
2012-02-16 | Perforation | 819.00 | 820.00 | 13 |
2012-02-16 | Perforation | 827.20 | 827.70 | 13 |
2012-02-16 | Perforation | 841.80 | 842.30 | 13 |
2012-02-16 | Perforation | 844.40 | 844.90 | 13 |
2012-02-16 | Perforation | 846.60 | 847.10 | 13 |
2012-02-10 | Fracture | 324.00 | 327.00 | 0 |
2012-02-19 | Fracture | 294.10 | 847.10 | 0 |
2012-02-10 | Fracture | 624.00 | 627.00 | 0 |
2012-02-10 | Fracture | 668.50 | 669.50 | 0 |
2012-02-16 | Perforation | 294.10 | 294.60 | 13 |
2012-02-16 | Perforation | 303.60 | 304.60 | 13 |
2012-02-16 | Perforation | 306.10 | 308.10 | 13 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7127 | 0.0 | 0.0 | 0.0 |
2013 | 8720 | 0.0 | 0.0 | 0.0 |
2014 | 8594 | 0.0 | 0.0 | 0.0 |
2015 | 8685 | 0.0 | 0.0 | 0.0 |
2016 | 8600 | 0.0 | 0.0 | 0.0 |
2017 | 7833 | 0.0 | 0.0 | 0.0 |
2018 | 8671 | 0.0 | 0.0 | 0.0 |
2019 | 8507 | 0.0 | 0.0 | 0.0 |
2020 | 2128 | 0.0 | 0.0 | 0.0 |
For data sources see[7]