X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284252913000

Well Details

Well ID: 0284252913000
Loading map...
Location: 00/13-29-028-25W4/0
Location Alias: 00/13-29-28-25 W4M
Location Alias 2: 00/13-29-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 29
County/Municipality: Rocky View County
Well Name: EMBER SWALWELL 13-29-28-25
Operator Name: Ember Resources Inc.
License Number: 0438058
License Date: 2011-10-27
License Status: Issued
Spud Date: 2012-01-14
Final Drill Date: 2012-01-15
Well Total Depth: 1239.00 m
Surface Hole Latitude: 51.431779
Surface Hole Longitude: -113.502017

For data sources see[1][2]

Well History

Date Event
2011-10-27 Obtained License
2012-01-14 Direction Drilling Operation Performed - Deviate
2012-01-14 Surface Casing Operation Performed
2012-01-15 Finished Drilling
2012-01-15 Production Casing Operation Performed
2012-01-15 Well Mode changed to Drilled and Cased
2012-01-16 Rig Released
2012-01-21 Well Log Performed
2012-02-02 Perforation Treatment Performed - Jet Perforation
2012-02-10 Perforation Treatment Performed - Fractured
2012-02-13 Well Fluid changed to Coalbed Methane-Coals and Other
2012-02-13 Well Mode changed to Testing
2012-02-18 Perforation Treatment Performed - Jet Perforation
2012-02-19 Perforation Treatment Performed - Fractured
2012-04-05 Well Began Production
2012-04-05 Well Fluid changed to Coalbed Methane-Coals and Other
2012-04-05 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-14 Precision Drilling Corporation 239 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-14 0.00 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-02 Perforation 447.00 449.00 13
2012-02-10 Fracture 914.00 916.00 0
2012-02-18 Perforation 328.70 329.70 13
2012-02-18 Perforation 338.90 340.40 13
2012-02-18 Perforation 340.80 341.30 13
2012-02-18 Perforation 347.60 349.10 13
2012-02-18 Perforation 367.00 369.00 13
2012-02-18 Perforation 413.40 413.90 13
2012-02-18 Perforation 508.50 510.00 13
2012-02-18 Perforation 518.70 519.70 13
2012-02-18 Perforation 612.00 614.00 13
2012-02-02 Perforation 607.00 609.00 13
2012-02-18 Perforation 664.60 666.60 13
2012-02-18 Perforation 681.10 683.10 13
2012-02-18 Perforation 687.10 687.60 13
2012-02-18 Perforation 693.90 694.40 13
2012-02-18 Perforation 715.90 716.40 13
2012-02-18 Perforation 722.80 724.30 13
2012-02-18 Perforation 745.50 746.00 13
2012-02-18 Perforation 751.90 752.90 13
2012-02-18 Perforation 776.90 779.90 13
2012-02-18 Perforation 787.90 788.40 13
2012-02-02 Perforation 628.00 630.00 13
2012-02-18 Perforation 792.80 793.30 13
2012-02-18 Perforation 803.30 803.80 13
2012-02-18 Perforation 804.20 804.70 13
2012-02-18 Perforation 816.30 817.30 13
2012-02-18 Perforation 824.10 825.10 13
2012-02-18 Perforation 825.80 826.80 13
2012-02-18 Perforation 834.60 836.10 13
2012-02-18 Perforation 846.00 847.00 13
2012-02-18 Perforation 849.40 849.90 13
2012-02-18 Perforation 852.10 852.60 13
2012-02-02 Perforation 729.50 731.50 13
2012-02-19 Fracture 328.70 852.60 0
2012-02-02 Perforation 914.00 916.00 13
2012-02-10 Fracture 447.00 449.00 0
2012-02-10 Fracture 607.00 609.00 0
2012-02-10 Fracture 628.00 630.00 0
2012-02-10 Fracture 729.50 731.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6551 0.0 0.0 0.0
2013 8719 0.0 0.0 0.0
2014 8594 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8600 0.0 0.0 0.0
2017 8575 0.0 0.0 0.0
2018 8671 0.0 0.0 0.0
2019 8507 0.0 0.0 0.0
2020 2128 0.0 0.0 0.0

For data sources see[7]

References