X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284252805000

Well Details

Well ID: 0284252805000
Loading map...
Location: 00/05-28-028-25W4/0
Location Alias: 00/05-28-28-25 W4M
Location Alias 2: 00/05-28-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 28
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 5-28-28-25
Operator Name: Ember Resources Inc.
License Number: 0294191
License Date: 2003-10-03
License Status: Issued
Spud Date: 2003-10-10
Final Drill Date: 2003-10-11
Well Total Depth: 733.00 m
Surface Hole Latitude: 51.420087
Surface Hole Longitude: -113.469719

For data sources see[1][2]

Well History

Date Event
2003-10-03 Obtained License
2003-10-09 Conductor Casing Operation Performed
2003-10-11 Finished Drilling
2003-10-11 Production Casing Operation Performed
2003-10-11 Rig Released
2003-10-11 Well Mode changed to Drilled and Cased
2003-10-21 Well Log Performed
2003-11-30 Perforation Treatment Performed - Jet Perforation
2004-09-02 Perforation Treatment Performed - Jet Perforation
2004-09-20 Perforation Treatment Performed - Fractured
2004-10-05 Well Began Production
2004-10-05 Well Fluid changed to Coalbed Methane-Coals and Other
2004-10-05 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-11-30 Perforation 593.50 596.50 13
2004-09-02 Perforation 459.20 460.20 13
2004-09-02 Perforation 470.50 471.50 13
2004-09-02 Perforation 497.00 498.00 13
2004-09-02 Perforation 500.70 501.70 13
2004-09-02 Perforation 511.00 512.00 13
2004-09-02 Perforation 523.90 524.90 13
2004-09-02 Perforation 525.60 526.60 13
2004-09-02 Perforation 544.70 545.70 13
2004-09-02 Perforation 546.90 547.90 13
2004-09-02 Perforation 554.50 555.50 13
2004-09-02 Perforation 198.70 199.70 13
2004-09-02 Perforation 559.80 560.80 13
2004-09-02 Perforation 569.50 570.50 13
2004-09-02 Perforation 578.80 579.80 13
2004-09-02 Perforation 585.60 587.60 13
2004-09-02 Perforation 600.50 601.50 13
2004-09-02 Perforation 612.40 614.40 13
2004-09-02 Perforation 615.20 616.20 13
2004-09-02 Perforation 619.00 620.00 13
2004-09-20 Fracture 198.70 620.00 0
2004-09-02 Perforation 212.00 214.00 13
2004-09-02 Perforation 220.20 221.20 13
2004-09-02 Perforation 264.90 265.90 13
2004-09-02 Perforation 327.40 328.40 13
2004-09-02 Perforation 345.10 346.10 13
2004-09-02 Perforation 444.60 445.60 13
2004-09-02 Perforation 446.30 447.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 2112 0.0 0.0 0.0
2005 8678 0.0 0.0 0.0
2006 8728 0.0 0.0 0.0
2007 8615 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8704 0.0 0.0 0.0
2011 8673 0.0 0.0 0.0
2012 8762 0.0 0.0 0.0
2013 8719 0.0 0.0 0.0
2014 8594 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8600 0.0 0.0 0.0
2017 8575 0.0 0.0 0.0
2018 8671 0.0 0.0 0.0
2019 8507 0.0 0.0 0.0
2020 2128 0.0 0.0 0.0

For data sources see[5]

References