X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284252112000

Well Details

Well ID: 0284252112000
Loading map...
Location: 00/12-21-028-25W4/0
Location Alias: 00/12-21-28-25 W4M
Location Alias 2: 00/12-21-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 21
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 12-21-28-25
Operator Name: Ember Resources Inc.
License Number: 0324074
License Date: 2005-01-12
License Status: Issued
Spud Date: 2005-02-08
Final Drill Date: 2005-02-09
Well Total Depth: 738.00 m
Surface Hole Latitude: 51.410182
Surface Hole Longitude: -113.471692

For data sources see[1][2]

Well History

Date Event
2005-01-12 Obtained License
2005-02-09 Finished Drilling
2005-02-09 Surface Casing Operation Performed
2005-02-09 Well Log Performed
2005-02-09 Well Mode changed to Drilled and Cased
2005-02-10 Production Casing Operation Performed
2005-02-10 Rig Released
2005-02-14 Well Log Performed
2005-03-03 Perforation Treatment Performed - Jet Perforation
2005-03-09 Well Began Production
2005-03-09 Well Fluid changed to Gas
2005-03-09 Well Mode changed to Flowing
2005-03-25 Perforation Treatment Performed - Fractured
2005-05-09 Perforation Treatment Performed - Jet Perforation
2005-05-14 Perforation Treatment Performed - Fractured
2005-05-27 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-03-03 Perforation 597.00 600.00 14
2005-05-09 Perforation 583.10 583.60 13
2005-05-09 Perforation 572.60 573.10 13
2005-05-09 Perforation 563.40 563.90 13
2005-05-09 Perforation 558.10 558.60 13
2005-05-09 Perforation 550.80 551.30 13
2005-05-09 Perforation 548.60 549.10 13
2005-05-09 Perforation 522.40 522.90 13
2005-05-09 Perforation 517.50 518.00 13
2005-05-09 Perforation 505.00 505.50 13
2005-05-09 Perforation 500.10 500.60 13
2005-03-25 Fracture 597.00 600.00 0
2005-05-09 Perforation 475.10 475.60 13
2005-05-09 Perforation 467.30 467.80 13
2005-05-09 Perforation 463.70 464.20 13
2005-05-09 Perforation 451.10 451.60 13
2005-05-09 Perforation 449.70 450.20 13
2005-05-09 Perforation 345.20 345.70 13
2005-05-09 Perforation 329.90 330.40 13
2005-05-09 Perforation 263.20 263.70 13
2005-05-09 Perforation 217.60 218.10 13
2005-05-09 Perforation 208.50 209.00 13
2005-05-09 Perforation 618.90 619.40 13
2005-05-09 Perforation 206.10 206.60 13
2005-05-09 Perforation 201.10 201.60 13
2005-05-14 Fracture 201.10 619.40 0
2005-05-09 Perforation 618.00 618.50 13
2005-05-09 Perforation 615.50 616.00 13
2005-05-09 Perforation 604.30 604.80 13
2005-05-09 Perforation 602.20 602.70 13
2005-05-09 Perforation 591.50 592.00 13
2005-05-09 Perforation 590.40 590.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 1271 0.0 0.0 0.0

For data sources see[5]

References