X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284250315002

Well Details

Well ID: 0284250315002
Loading map...
Location: 00/15-03-028-25W4/2
Location Alias: 00/15-03-28-25 W4M
Location Alias 2: 00/15-03-028-25 W4/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 03
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 15-3-28-25
Operator Name: Ember Resources Inc.
License Number: 0335766
License Date: 2005-08-03
License Status: Issued
Spud Date: 2005-10-25
Final Drill Date: 2005-10-27
Well Total Depth: 987.00 m
Surface Hole Latitude: 51.370920
Surface Hole Longitude: -113.436414

For data sources see[1][2]

Well History

Date Event
2005-08-03 Obtained License
2005-10-25 Surface Casing Operation Performed
2005-10-27 Finished Drilling
2005-10-27 Production Casing Operation Performed
2005-10-27 Rig Released
2005-10-27 Well Mode changed to Drilled and Cased
2005-10-31 Well Log Performed
2005-11-26 Perforation Treatment Performed - Jet Perforation
2006-01-09 Perforation Treatment Performed - Jet Perforation
2006-01-22 Perforation Treatment Performed - Fractured
2006-02-02 Well Began Production
2006-02-02 Well Fluid changed to Coalbed Methane-Coals and Other
2006-02-02 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-11-26 Perforation 662.50 664.50 13
2006-01-09 Perforation 563.20 563.70 7
2006-01-09 Perforation 555.80 556.30 7
2006-01-09 Perforation 554.30 554.80 7
2006-01-09 Perforation 543.20 543.70 7
2006-01-09 Perforation 536.20 536.70 7
2006-01-09 Perforation 530.40 530.90 7
2006-01-09 Perforation 499.90 500.40 7
2006-01-09 Perforation 492.30 492.80 7
2006-01-09 Perforation 477.10 477.60 7
2006-01-09 Perforation 472.60 473.10 7
2006-01-09 Perforation 770.10 770.60 7
2006-01-09 Perforation 456.00 456.50 7
2006-01-09 Perforation 450.80 451.30 7
2006-01-09 Perforation 447.40 447.90 7
2006-01-09 Perforation 438.30 438.80 7
2006-01-09 Perforation 428.90 429.90 13
2006-01-09 Perforation 426.80 427.30 7
2006-01-09 Perforation 375.80 376.30 7
2006-01-09 Perforation 331.90 332.40 7
2006-01-09 Perforation 325.90 326.40 7
2006-01-09 Perforation 319.80 320.30 7
2006-01-09 Perforation 736.20 736.70 7
2006-01-09 Perforation 312.50 313.00 7
2006-01-09 Perforation 306.50 307.00 7
2006-01-09 Perforation 247.60 248.10 7
2006-01-09 Perforation 207.50 208.00 7
2006-01-22 Fracture 207.50 770.60 0
2006-01-09 Perforation 604.50 605.00 7
2006-01-09 Perforation 603.40 603.90 7
2006-01-09 Perforation 582.00 582.50 7
2006-01-09 Perforation 572.70 573.20 7
2006-01-09 Perforation 567.90 568.40 7
2006-01-09 Perforation 566.80 567.30 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 7911 0.0 0.0 0.0
2007 8708 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8746 0.0 0.0 0.0
2011 8728 0.0 0.0 0.0
2012 8778 0.0 0.0 0.0
2013 8715 0.0 0.0 0.0
2014 8671 0.0 0.0 0.0
2015 8699 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8745 0.0 0.0 0.0
2019 8562 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[5]

References