X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284250304000

Well Details

Well ID: 0284250304000
Loading map...
Location: 00/04-03-028-25W4/0
Location Alias: 00/04-03-28-25 W4M
Location Alias 2: 00/04-03-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 03
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 4-3-28-25
Operator Name: Ember Resources Inc.
License Number: 0293680
License Date: 2003-09-24
License Status: Issued
Spud Date: 2003-10-10
Final Drill Date: 2003-10-11
Well Total Depth: 715.00 m
Surface Hole Latitude: 51.360785
Surface Hole Longitude: -113.445753

For data sources see[1][2]

Well History

Date Event
2003-09-24 Obtained License
2003-10-10 Surface Casing Operation Performed
2003-10-11 Finished Drilling
2003-10-11 Production Casing Operation Performed
2003-10-11 Rig Released
2003-10-11 Well Mode changed to Drilled and Cased
2003-10-20 Well Log Performed
2003-11-29 Perforation Treatment Performed - Jet Perforation
2003-12-01 Perforation Treatment Performed - Fractured
2004-01-12 Well Log Performed
2004-10-21 Well Began Production
2004-10-21 Well Fluid changed to Coalbed Methane-Coals Only
2004-10-21 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-11-29 Perforation 194.80 195.80 13
2003-11-29 Perforation 415.00 416.00 13
2003-11-29 Perforation 416.80 417.80 13
2003-11-29 Perforation 426.60 427.60 13
2003-11-29 Perforation 433.70 434.70 13
2003-11-29 Perforation 435.20 436.20 13
2003-11-29 Perforation 442.40 443.40 13
2003-11-29 Perforation 469.20 470.20 13
2003-11-29 Perforation 473.50 474.50 13
2003-11-29 Perforation 487.90 489.90 13
2003-11-29 Perforation 514.50 515.50 13
2003-11-29 Perforation 236.10 237.10 13
2003-11-29 Perforation 521.90 522.90 13
2003-11-29 Perforation 528.10 529.10 13
2003-11-29 Perforation 535.00 536.00 13
2003-11-29 Perforation 545.20 546.20 13
2003-11-29 Perforation 553.40 554.40 13
2003-11-29 Perforation 558.10 559.10 13
2003-11-29 Perforation 560.40 561.40 13
2003-11-29 Perforation 570.20 571.20 13
2003-11-29 Perforation 590.70 591.70 13
2003-11-29 Perforation 592.10 593.10 13
2003-11-29 Perforation 294.80 295.80 13
2003-11-29 Perforation 594.50 595.50 13
2003-11-29 Perforation 598.40 599.40 13
2003-12-01 Fracture 194.80 599.40 0
2003-11-29 Perforation 300.30 301.30 13
2003-11-29 Perforation 308.60 309.60 13
2003-11-29 Perforation 315.10 316.10 13
2003-11-29 Perforation 321.10 322.10 13
2003-11-29 Perforation 358.80 359.80 13
2003-11-29 Perforation 363.80 364.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 1728 0.0 0.0 0.0
2005 8653 0.0 0.0 0.0
2006 8685 0.0 0.0 0.0
2007 8708 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8746 0.0 0.0 0.0
2011 8728 0.0 0.0 0.0
2012 8778 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8671 0.0 0.0 0.0
2015 8699 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8745 0.0 0.0 0.0
2019 8562 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[5]

References