If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284243213000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.444636,"lon":-113.354386,"icon":""}]} |
Location: 00/13-32-028-24W4/0 | |
Location Alias: 00/13-32-28-24 W4M | |
Location Alias 2: 00/13-32-028-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 24 | |
Section: 32 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ENTICE 13-32-28-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0326389 | |
License Date: 2005-02-14 | |
License Status: Issued | |
Spud Date: 2005-05-23 | |
Final Drill Date: 2005-07-02 | |
Well Total Depth: 932.00 m | |
Surface Hole Latitude: 51.444636 | |
Surface Hole Longitude: -113.354386 |
Date | Event |
---|---|
2005-02-14 | Obtained License |
2005-05-23 | Surface Casing Operation Performed |
2005-07-02 | Finished Drilling |
2005-07-02 | Production Casing Operation Performed |
2005-07-02 | Rig Released |
2005-07-02 | Well Mode changed to Drilled and Cased |
2005-07-06 | Well Log Performed |
2005-08-02 | Perforation Treatment Performed - Jet Perforation |
2005-08-13 | Perforation Treatment Performed - Fractured |
2005-08-25 | Well Began Production |
2005-08-25 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-08-25 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-08-02 | Perforation | 844.20 | 844.70 | 13 |
2005-08-02 | Perforation | 530.60 | 531.10 | 13 |
2005-08-02 | Perforation | 524.30 | 524.80 | 13 |
2005-08-02 | Perforation | 515.50 | 516.00 | 13 |
2005-08-02 | Perforation | 506.40 | 506.90 | 13 |
2005-08-02 | Perforation | 502.70 | 503.20 | 13 |
2005-08-02 | Perforation | 493.80 | 494.30 | 13 |
2005-08-02 | Perforation | 463.70 | 464.20 | 13 |
2005-08-02 | Perforation | 461.70 | 462.20 | 13 |
2005-08-02 | Perforation | 456.30 | 456.80 | 13 |
2005-08-02 | Perforation | 454.80 | 455.30 | 13 |
2005-08-02 | Perforation | 841.40 | 841.90 | 13 |
2005-08-02 | Perforation | 447.70 | 448.20 | 13 |
2005-08-02 | Perforation | 442.60 | 443.10 | 13 |
2005-08-02 | Perforation | 440.10 | 440.60 | 13 |
2005-08-02 | Perforation | 426.60 | 427.10 | 13 |
2005-08-02 | Perforation | 417.00 | 417.50 | 13 |
2005-08-02 | Perforation | 406.90 | 407.40 | 13 |
2005-08-02 | Perforation | 403.40 | 403.90 | 13 |
2005-08-02 | Perforation | 396.30 | 396.80 | 13 |
2005-08-02 | Perforation | 391.30 | 391.80 | 13 |
2005-08-02 | Perforation | 382.80 | 383.30 | 13 |
2005-08-02 | Perforation | 690.70 | 691.20 | 13 |
2005-08-02 | Perforation | 369.30 | 369.80 | 13 |
2005-08-02 | Perforation | 363.10 | 363.60 | 13 |
2005-08-02 | Perforation | 345.50 | 346.00 | 13 |
2005-08-02 | Perforation | 301.80 | 302.30 | 13 |
2005-08-02 | Perforation | 297.50 | 298.00 | 13 |
2005-08-02 | Perforation | 284.70 | 285.20 | 13 |
2005-08-02 | Perforation | 270.40 | 270.90 | 13 |
2005-08-02 | Perforation | 259.60 | 260.10 | 13 |
2005-08-02 | Perforation | 210.30 | 210.80 | 13 |
2005-08-02 | Perforation | 183.50 | 184.00 | 13 |
2005-08-02 | Perforation | 564.70 | 565.20 | 13 |
2005-08-13 | Fracture | 183.50 | 844.70 | 0 |
2005-08-02 | Perforation | 563.80 | 564.30 | 13 |
2005-08-02 | Perforation | 562.80 | 563.30 | 13 |
2005-08-02 | Perforation | 545.20 | 545.70 | 13 |
2005-08-02 | Perforation | 543.40 | 543.90 | 13 |
2005-08-02 | Perforation | 536.30 | 536.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 2939 | 0.0 | 0.0 | 0.0 |
2006 | 8596 | 0.0 | 0.0 | 0.0 |
2007 | 7623 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8750 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 8570 | 0.0 | 0.0 | 0.0 |
2013 | 8611 | 0.0 | 0.0 | 0.0 |
2014 | 8644 | 0.0 | 0.0 | 0.0 |
2015 | 8722 | 0.0 | 0.0 | 0.0 |
2016 | 8684 | 0.0 | 0.0 | 0.0 |
2017 | 8649 | 0.0 | 0.0 | 0.0 |
2018 | 8688 | 0.0 | 0.0 | 0.0 |
2019 | 8673 | 0.0 | 0.0 | 0.0 |
2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[5]