If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284241508000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.393342,"lon":-113.288268,"icon":""}]} |
Location: 00/08-15-028-24W4/0 | |
Location Alias: 00/08-15-28-24 W4M | |
Location Alias 2: 00/08-15-028-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 24 | |
Section: 15 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ENTICE 8-15-28-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0356512 | |
License Date: 2006-05-02 | |
License Status: Issued | |
Spud Date: 2006-12-19 | |
Final Drill Date: 2007-01-04 | |
Well Total Depth: 721.00 m | |
Surface Hole Latitude: 51.393342 | |
Surface Hole Longitude: -113.288268 |
Date | Event |
---|---|
2006-05-02 | Obtained License |
2006-12-19 | Surface Casing Operation Performed |
2007-01-04 | Finished Drilling |
2007-01-04 | Well Mode changed to Drilled and Cased |
2007-01-05 | Production Casing Operation Performed |
2007-01-05 | Rig Released |
2007-01-09 | Well Log Performed |
2007-01-21 | Perforation Treatment Performed - Jet Perforation |
2007-02-02 | Well Fluid changed to Gas |
2007-02-02 | Well Mode changed to Testing |
2007-02-16 | Well Began Production |
2007-02-16 | Well Fluid changed to Gas |
2007-02-16 | Well Mode changed to Flowing |
2008-12-20 | Perforation Treatment Performed - Jet Perforation |
2009-01-06 | Perforation Treatment Performed - Fractured |
2009-01-13 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-01-13 | Well Mode changed to Flowing |
2010-09-30 | Perforation Treatment Performed - Jet Perforation |
2010-10-12 | Perforation Treatment Performed - Fractured |
2010-10-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-10-19 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-01-21 | Perforation | 686.50 | 688.50 | 13 |
2008-12-20 | Perforation | 394.00 | 397.00 | 13 |
2008-12-20 | Perforation | 311.00 | 314.00 | 13 |
2008-12-20 | Perforation | 323.60 | 324.10 | 14 |
2008-12-20 | Perforation | 299.10 | 299.60 | 14 |
2008-12-20 | Perforation | 237.10 | 237.60 | 14 |
2008-12-20 | Perforation | 552.80 | 553.20 | 14 |
2008-12-20 | Perforation | 539.30 | 539.80 | 14 |
2008-12-20 | Perforation | 532.40 | 533.40 | 13 |
2008-12-20 | Perforation | 585.10 | 586.10 | 13 |
2008-12-20 | Perforation | 582.80 | 583.30 | 14 |
2008-12-20 | Perforation | 415.60 | 416.10 | 14 |
2008-12-20 | Perforation | 565.20 | 565.70 | 14 |
2008-12-20 | Perforation | 525.90 | 526.40 | 14 |
2008-12-20 | Perforation | 440.30 | 440.80 | 14 |
2008-12-20 | Perforation | 470.40 | 472.40 | 13 |
2008-12-20 | Perforation | 468.00 | 468.50 | 14 |
2008-12-20 | Perforation | 519.30 | 519.80 | 14 |
2008-12-20 | Perforation | 511.50 | 512.00 | 14 |
2008-12-20 | Perforation | 479.20 | 482.20 | 13 |
2009-01-06 | Fracture | 311.00 | 408.50 | 0 |
2009-01-06 | Fracture | 237.10 | 586.10 | 0 |
2008-12-20 | Perforation | 415.00 | 415.50 | 14 |
2010-09-30 | Perforation | 558.00 | 560.00 | 13 |
2010-09-30 | Perforation | 505.00 | 508.00 | 13 |
2010-09-30 | Perforation | 485.00 | 488.00 | 13 |
2010-09-30 | Perforation | 445.00 | 447.00 | 13 |
2010-09-30 | Perforation | 384.00 | 386.00 | 13 |
2010-09-30 | Perforation | 332.50 | 333.50 | 13 |
2010-09-30 | Perforation | 293.00 | 296.00 | 13 |
2010-09-30 | Perforation | 261.00 | 264.00 | 13 |
2010-09-30 | Perforation | 208.00 | 210.00 | 13 |
2010-10-12 | Fracture | 208.00 | 560.00 | 0 |
2008-12-20 | Perforation | 402.50 | 403.00 | 14 |
2008-12-20 | Perforation | 432.60 | 433.60 | 13 |
2008-12-20 | Perforation | 425.10 | 425.60 | 14 |
2008-12-20 | Perforation | 416.70 | 417.70 | 13 |
2008-12-20 | Perforation | 364.50 | 365.00 | 14 |
2008-12-20 | Perforation | 405.50 | 408.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 7632 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8316 | 0.0 | 0.0 | 0.0 |
2011 | 8680 | 0.0 | 0.0 | 0.0 |
2012 | 8566 | 0.0 | 0.0 | 0.0 |
2013 | 8323 | 0.0 | 0.0 | 0.0 |
2014 | 8614 | 0.0 | 0.0 | 0.0 |
2015 | 8669 | 0.0 | 0.0 | 0.0 |
2016 | 8650 | 0.0 | 0.0 | 0.0 |
2017 | 8331 | 0.0 | 0.0 | 0.0 |
2018 | 8624 | 0.0 | 0.0 | 0.0 |
2019 | 8463 | 0.0 | 0.0 | 0.0 |
2020 | 2132 | 0.0 | 0.0 | 0.0 |
For data sources see[5]