X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284222506003

Well Details

Well ID: 0284222506003
Loading map...
Location: 00/06-25-028-22W4/3
Location Alias: 00/06-25-28-22 W4M
Location Alias 2: 00/06-25-028-22 W4/03
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 22
Section: 25
County/Municipality: Kneehill County
Well Name: ECA ECOG WAYNE 6-25-28-22
Operator Name: Lynx Energy ULC
License Number: 0407345
License Date: 2009-01-06
License Status: Issued
Spud Date: 2009-01-15
Final Drill Date: 2009-01-19
Well Total Depth: 1621.00 m
Surface Hole Latitude: 51.418342
Surface Hole Longitude: -112.974870

For data sources see[1][2]

Well History

Date Event
2009-01-06 Obtained License
2009-01-16 Surface Casing Operation Performed
2009-01-17 Direction Drilling Operation Performed - Deviate
2009-01-19 Finished Drilling
2009-01-19 Well Log Performed
2009-01-19 Well Mode changed to Drilled and Cased
2009-01-20 Production Casing Operation Performed
2009-01-20 Rig Released
2009-02-04 Perforation Treatment Performed - Jet Perforation
2009-02-04 Well Log Performed
2009-02-23 Perforation Treatment Performed - Jet Perforation
2009-02-23 Well Log Performed
2009-03-08 Perforation Treatment Performed - Jet Perforation
2009-03-08 Well Log Performed
2010-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-09 Perforation Treatment Performed - Jet Perforation
2010-02-09 Plug Back Performed
2010-03-01 Perforation Treatment Performed - Fractured
2010-03-04 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-01-17 772.80 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-04 Perforation 1593.50 1595.00 17
2010-02-09 Packing Device Capped w/Cement 1577.00 1585.00 0
2010-02-09 Perforation 654.00 656.00 13
2010-02-09 Perforation 705.00 707.50 13
2010-03-01 Fracture 618.00 620.00 0
2010-03-01 Fracture 595.00 597.00 0
2010-03-01 Fracture 705.00 707.50 0
2010-03-01 Fracture 751.50 753.50 0
2010-03-01 Fracture 654.00 656.00 0
2010-03-01 Fracture 634.00 637.00 0
2009-02-23 Perforation 1599.00 1600.00 17
2009-03-08 Perforation 1595.00 1597.00 17
2009-03-08 Perforation 1591.00 1592.00 17
2010-02-09 Perforation 618.00 620.00 13
2010-02-09 Perforation 634.00 637.00 13
2010-02-09 Perforation 321.00 328.00 13
2010-02-09 Perforation 595.00 597.00 13
2010-02-09 Perforation 751.50 753.50 13

For data sources see[5]



References