If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284210314000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.372941,"lon":-112.883326,"icon":""}]} |
Location: 00/14-03-028-21W4/0 | |
Location Alias: 00/14-03-28-21 W4M | |
Location Alias 2: 00/14-03-028-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 21 | |
Section: 03 | |
County/Municipality: Kneehill County | |
Well Name: ECA WAYNE 14-3-28-21 | |
Operator Name: Lynx Energy ULC | |
License Number: 0446944 | |
License Date: 2012-06-28 | |
License Status: Issued | |
Spud Date: 2012-09-04 | |
Final Drill Date: 2012-09-05 | |
Well Total Depth: 893.00 m | |
Surface Hole Latitude: 51.372941 | |
Surface Hole Longitude: -112.883326 |
Date | Event |
---|---|
2012-06-28 | Obtained License |
2012-09-04 | Direction Drilling Operation Performed - Deviate |
2012-09-04 | Surface Casing Operation Performed |
2012-09-05 | Finished Drilling |
2012-09-05 | Production Casing Operation Performed |
2012-09-05 | Rig Released |
2012-09-05 | Well Mode changed to Drilled and Cased |
2012-09-13 | Well Log Performed |
2012-10-01 | Perforation Treatment Performed - Jet Perforation |
2012-10-16 | Perforation Treatment Performed - Fractured |
2012-10-24 | Well Fluid changed to Gas |
2012-10-24 | Well Mode changed to Testing |
2012-12-04 | Well Fluid changed to Gas |
2012-12-04 | Well Mode changed to Test Completed |
2012-12-05 | Well Began Production |
2012-12-05 | Well Fluid changed to Gas |
2012-12-05 | Well Mode changed to Flowing |
2013-10-04 | Perforation Treatment Performed - Jet Perforation |
2013-10-06 | Perforation Treatment Performed - Fractured |
2013-10-23 | Well Fluid changed to Coalbed Methane-Coals and Other |
2013-10-23 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-09-04 | Precision Drilling Corporation | 255 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-09-04 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-01 | Perforation | 651.00 | 653.00 | 13 |
2012-10-16 | Fracture | 722.00 | 725.00 | 0 |
2012-10-16 | Fracture | 757.00 | 761.00 | 0 |
2012-10-16 | Fracture | 801.50 | 802.50 | 0 |
2012-10-16 | Fracture | 812.50 | 813.50 | 0 |
2013-10-04 | Perforation | 800.20 | 800.70 | 13 |
2013-10-04 | Perforation | 789.80 | 790.30 | 13 |
2013-10-04 | Perforation | 532.00 | 533.00 | 13 |
2013-10-04 | Perforation | 476.40 | 476.90 | 13 |
2013-10-04 | Perforation | 457.30 | 457.80 | 13 |
2013-10-04 | Perforation | 452.50 | 453.50 | 13 |
2012-10-01 | Perforation | 698.00 | 699.00 | 13 |
2013-10-04 | Perforation | 386.50 | 388.00 | 13 |
2013-10-04 | Perforation | 342.00 | 348.00 | 13 |
2013-10-04 | Perforation | 324.00 | 330.00 | 13 |
2013-10-04 | Perforation | 311.00 | 316.00 | 13 |
2013-10-04 | Perforation | 292.80 | 294.30 | 13 |
2013-10-06 | Fracture | 800.20 | 800.70 | 0 |
2013-10-06 | Fracture | 789.80 | 790.30 | 0 |
2013-10-06 | Fracture | 532.00 | 533.00 | 0 |
2013-10-06 | Fracture | 476.40 | 476.90 | 0 |
2013-10-06 | Fracture | 457.30 | 457.80 | 0 |
2012-10-01 | Perforation | 722.00 | 725.00 | 13 |
2013-10-06 | Fracture | 452.50 | 453.50 | 0 |
2013-10-06 | Fracture | 386.50 | 388.00 | 0 |
2013-10-06 | Fracture | 342.00 | 348.00 | 0 |
2013-10-06 | Fracture | 324.00 | 330.00 | 0 |
2013-10-06 | Fracture | 311.00 | 316.00 | 0 |
2013-10-06 | Fracture | 292.80 | 294.30 | 0 |
2012-10-01 | Perforation | 757.00 | 758.00 | 13 |
2012-10-01 | Perforation | 758.00 | 761.00 | 13 |
2012-10-01 | Perforation | 801.50 | 802.50 | 13 |
2012-10-01 | Perforation | 812.50 | 813.50 | 13 |
2012-10-16 | Fracture | 651.00 | 653.00 | 0 |
2012-10-16 | Fracture | 698.00 | 699.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-10-06 | 2013-10-06 | 766 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen | 7727-37-9 | 100 | 100 | N/A |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 652 | 0.0 | 0.0 | 0.0 |
2013 | 8570 | 0.0 | 0.0 | 0.0 |
2014 | 8677 | 0.0 | 0.0 | 0.0 |
2015 | 8693 | 0.0 | 0.0 | 0.0 |
2016 | 8590 | 0.0 | 0.0 | 0.0 |
2017 | 8653 | 0.0 | 0.0 | 0.0 |
2018 | 8750 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-05 | No Incident Encountered | 0.00 | 0.00 |
2012-10-24 | No Incident Encountered | 0.00 | 0.00 |
2013-10-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]