X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284192502000

Well Details

Well ID: 0284192502000
Loading map...
Location: 00/02-25-028-19W4/0
Location Alias: 00/02-25-28-19 W4M
Location Alias 2: 00/02-25-028-19 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 19
Section: 25
County/Municipality: Starland County
Well Name: SLE DRUM 2-25-28-19
Operator Name: SanLing Energy Ltd.
License Number: 0009320
License Date: 1955-03-23
License Status: Issued
Spud Date: 1955-06-22
Final Drill Date: 1955-08-07
Well Total Depth: 1690.70 m
Surface Hole Latitude: 51.417520
Surface Hole Longitude: -112.545237

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-03-23 Obtained License
1955-07-09 Drill Stem Test Performed
1955-07-10 Drill Stem Test Performed
1955-08-05 Drill Stem Test Performed
1955-08-07 Finished Drilling
1955-08-08 Drill Stem Test Performed
1955-08-11 Production Casing Operation Performed
1955-08-26 Well Mode changed to Drilled and Cased
1964-04-01 Perforation Treatment Performed - Bullet Perforation
1964-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-04-04 Perforation Treatment Performed - Cement Squeeze
1964-04-09 Perforation Treatment Performed - Bullet Perforation
1964-04-10 Perforation Treatment Performed - Abrasa-Jet Perforation
1964-04-10 Perforation Treatment Performed - Fractured
1964-04-10 Well Mode changed to Drilled and Cased
1964-10-22 Perforation Treatment Performed - Condensate Squeeze
1977-02-12 Well Began Production
1977-02-12 Well Fluid changed to Gas
1977-02-12 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-04-01 Bullet Perforation 1281.10 1283.80 3
1964-04-01 Bullet Perforation 1258.80 1261.90 7
1964-04-02 Acid Treatment 1258.80 1283.80 0
1964-04-04 Acid Treatment 1281.10 1283.80 0
1964-04-04 Cement Squeeze 1258.80 1283.80 0
1964-04-09 Bullet Perforation 1281.10 1281.70 10
1964-04-10 Fracture 1281.10 1281.70 0
1964-04-10 Hydra Jet Perforation 1261.90 1261.90 0
1964-10-22 Condensate Squeeze 1261.90 1281.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 4918 0.0 0.0 0.0
1978 3014 0.0 0.0 0.0
1979 4282 0.0 0.0 0.0
1980 5060 0.0 0.0 0.0
1981 4618 0.0 0.0 0.0
1982 5818 0.0 0.0 0.0
1983 3121 0.0 0.0 0.0
1984 4461 0.0 0.0 0.0
1985 5476 0.0 0.0 0.0
1986 5104 0.0 0.0 0.0
1987 3513 0.0 0.0 0.0
1988 3431 0.0 0.0 0.0
1989 5450 0.0 0.0 0.0
1990 1449 0.0 0.0 0.0
1991 823 0.0 0.0 0.0
1992 4326 0.0 0.0 0.0
1993 8231 0.0 0.0 0.0
1994 6802 0.0 0.0 0.0
1995 8436 0.0 0.0 0.0
1996 8396 0.0 0.0 0.0
1997 8696 0.0 0.0 0.0
1998 8646 0.0 0.0 0.0
1999 8640 0.0 0.0 0.0
2000 8695 0.0 0.0 0.0
2001 8623 0.0 0.0 0.0
2002 8579 0.0 0.0 0.0
2003 8324 0.0 0.0 0.0
2004 8629 0.0 0.0 0.0
2005 8515 0.0 0.0 0.0
2006 8664 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8722 0.0 0.0 0.0
2011 8717 0.0 0.0 0.0
2012 8723 0.0 0.0 0.0
2013 8644 0.0 0.0 0.0
2014 8605 0.0 0.0 0.0
2015 8753 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 8559 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References