If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284192213022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.415354,"lon":-112.578962,"icon":""}]} |
Location: 02/13-22-028-19W4/2 | |
Location Alias: 02/13-22-28-19 W4M | |
Location Alias 2: 02/13-22-028-19 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 19 | |
Section: 22 | |
County/Municipality: Starland County | |
Well Name: SPL 13-23 HZ 102 WAYNE 13-22-28-19 | |
Operator Name: Spur Petroleum Ltd. | |
License Number: 0485470 | |
License Date: 2017-09-18 | |
License Status: Issued | |
Spud Date: 2017-10-26 | |
Final Drill Date: 2017-11-06 | |
Well Total Depth: 2860.00 m | |
Surface Hole Latitude: 51.415354 | |
Surface Hole Longitude: -112.578962 |
Date | Event |
---|---|
2017-09-18 | Obtained License |
2017-10-27 | Surface Casing Operation Performed |
2017-10-28 | Direction Drilling Operation Performed - Deviate |
2017-10-29 | Direction Drilling Operation Performed - Horizontal |
2017-10-31 | Intermediate Casing Operation Performed |
2017-11-03 | Direction Drilling Operation Performed - Horizontal |
2017-11-06 | Finished Drilling |
2017-11-06 | Well Log Performed |
2017-11-06 | Well Structure changed to Drain |
2017-11-11 | Perforation Treatment Performed - Open-Hole Completion |
2017-11-11 | Rig Released |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2017-10-28 | 969.20 | Deviate (5 - 79 degrees) |
2017-10-29 | 1400.90 | Horizontal |
2017-11-03 | 1706.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-11-11 | Open Hole/Barefoot Completion | 1706.00 | 2860.00 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-11-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]