X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284080601000

Well Details

Well ID: 0284080601000
Loading map...
Location: 00/01-06-028-08W4/0
Location Alias: 00/01-06-28-08 W4M
Location Alias 2: 00/01-06-028-08 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 08
Section: 06
County/Municipality: Special Areas No. 3
Well Name: CNRL HEATHDLE 1-6-28-8
Operator Name: Canadian Natural Resources Limited
License Number: 0342342
License Date: 2005-11-09
License Status: Issued
Spud Date: 2005-12-01
Final Drill Date: 2005-12-05
Well Total Depth: 1060.00 m
Surface Hole Latitude: 51.358918
Surface Hole Longitude: -111.108908

For data sources see[1][2]

Well History

Date Event
2005-11-09 Obtained License
2005-12-01 Conductor Casing Operation Performed
2005-12-03 Direction Drilling Operation Performed - Deviate
2005-12-05 Finished Drilling
2005-12-05 Well Mode changed to Drilled and Cased
2005-12-07 Well Log Performed
2005-12-08 Production Casing Operation Performed
2005-12-08 Rig Released
2006-02-10 Well Log Performed
2006-02-11 Perforation Treatment Performed - Bridge Plug No Cement Required
2006-02-11 Perforation Treatment Performed - Jet Perforation
2006-02-11 Well Log Performed
2006-02-13 Perforation Treatment Performed - Fractured
2006-12-19 Well Began Production
2006-12-19 Well Fluid changed to Crude Oil
2006-12-19 Well Mode changed to Pumping
2008-09-12 Perforation Treatment Performed - Jet Perforation
2008-09-12 Well Log Performed
2008-09-14 Perforation Treatment Performed - Fractured
2008-11-01 Well Fluid changed to Crude Oil
2008-11-01 Well Mode changed to Suspended
2012-01-16 Well Fluid changed to Crude Oil
2012-01-16 Well Mode changed to Flowing
2017-01-01 Well Fluid changed to Crude Oil
2017-01-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-12-03 175.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-11 Bridge Plug, No Cement 1053.00 1053.40 0
2006-02-11 Perforation 1037.70 1039.70 17
2006-02-11 Perforation 1029.70 1035.70 17
2006-02-13 Fracture 1037.70 1039.70 0
2006-02-13 Fracture 1029.70 1035.70 0
2008-09-12 Perforation 984.00 990.00 17
2008-09-12 Perforation 980.00 984.00 17
2008-09-14 Fracture 980.00 990.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 300 0.0 0.0 0.0
2007 8040 0.0 0.0 0.0
2008 5869 0.0 0.0 0.0
2012 7032 0.0 0.0 0.0
2013 8617 0.0 0.0 0.0
2014 8681 0.0 0.0 0.0
2015 8548 0.0 0.0 0.0
2016 7857 0.0 0.0 0.0
2017 7306 0.0 0.0 0.0
2018 8371 0.0 0.0 0.0
2019 8244 0.0 0.0 0.0
2020 1803 0.0 0.0 0.0

For data sources see[6]

References