If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284061301002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.387796,"lon":-110.713306,"icon":""}]} |
Location: 00/01-13-028-06W4/2 | |
Location Alias: 00/01-13-28-06 W4M | |
Location Alias 2: 00/01-13-028-06 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 06 | |
Section: 13 | |
County/Municipality: Special Areas No. 3 | |
Well Name: Canlin KIRKWALL 1-13-28-6 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0335043 | |
License Date: 2005-07-21 | |
License Status: Suspension | |
Spud Date: 2005-08-21 | |
Final Drill Date: 2005-08-25 | |
Well Total Depth: 993.00 m | |
Surface Hole Latitude: 51.387796 | |
Surface Hole Longitude: -110.713306 |
Date | Event |
---|---|
2005-07-21 | Obtained License |
2005-08-23 | Surface Casing Operation Performed |
2005-08-25 | Finished Drilling |
2005-08-25 | Production Casing Operation Performed |
2005-08-25 | Well Log Performed |
2005-08-25 | Well Mode changed to Drilled and Cased |
2005-08-26 | Rig Released |
2005-09-30 | Perforation Treatment Performed - Jet Perforation |
2005-10-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-10-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-10-05 | Perforation Treatment Performed - Jet Perforation |
2005-10-05 | Plug Back Performed |
2006-03-23 | Well Began Production |
2006-03-23 | Well Fluid changed to Gas |
2006-03-23 | Well Mode changed to Flowing |
2011-09-01 | Well Fluid changed to Gas |
2011-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-09-30 | Perforation | 923.50 | 924.90 | 8 |
2005-10-03 | Acid Treatment | 923.50 | 924.90 | 0 |
2005-10-05 | Packing Device Capped w/Cement | 907.00 | 915.00 | 0 |
2005-10-05 | Perforation | 879.00 | 880.50 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 6766 | 0.0 | 0.0 | 0.0 |
2007 | 8450 | 0.0 | 0.0 | 0.0 |
2008 | 8291 | 0.0 | 0.0 | 0.0 |
2009 | 8488 | 0.0 | 0.0 | 0.0 |
2010 | 623 | 0.0 | 0.0 | 0.0 |
For data sources see[5]