X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284032206002

Well Details

Well ID: 0284032206002
Loading map...
Location: 00/06-22-028-03W4/2
Location Alias: 00/06-22-28-03 W4M
Location Alias 2: 00/06-22-028-03 W4/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 03
Section: 22
County/Municipality: Special Areas No. 3
Well Name: HUNT ET AL BENTON 6-22-28-3
Operator Name: HOC Energy Corp.
License Number: 0143591
License Date: 1990-03-06
License Status: RecCertified
Spud Date: 1990-03-26
Final Drill Date: 1990-03-30
Well Total Depth: 1014.00 m
Surface Hole Latitude: 51.406655
Surface Hole Longitude: -110.348620

For data sources see[1][2]

Well History

Date Event
1990-03-06 Obtained License
1990-03-27 Surface Casing Operation Performed
1990-03-30 Finished Drilling
1990-03-30 Well Log Performed
1990-03-31 Drill Stem Test Performed
1990-04-01 Drill Stem Test Performed
1990-04-02 Drill Stem Test Performed
1990-04-02 Production Casing Operation Performed
1990-04-03 Rig Released
1990-04-07 Well Log Performed
1990-04-10 Perforation Treatment Performed - Jet Perforation
1990-04-10 Well Log Performed
1990-04-14 Well Log Performed
1990-04-15 Perforation Treatment Performed - Jet Perforation
1990-04-16 Perforation Treatment Performed - Cement Squeeze
1990-04-18 Perforation Treatment Performed - Jet Perforation
1990-04-18 Well Log Performed
1990-04-19 Perforation Treatment Performed - Fractured
1990-04-23 Well Mode changed to Drilled and Cased
1990-05-14 Well Mode changed to Drilled and Cased
1994-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-01 Plug Back Performed
1994-09-01 Well Abandoned
1994-09-01 Well Log Performed
1994-09-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-04-10 Perforation 954.00 955.00 13
1990-04-15 Perforation 784.00 785.50 13
1990-04-16 Cement Squeeze 784.00 785.50 0
1990-04-18 Perforation 671.00 674.80 13
1990-04-19 Fracture 671.00 674.80 0
1994-09-01 Packing Device Capped w/Cement 937.00 945.00 0
1994-09-01 Packing Device Capped w/Cement 654.00 662.00 0

For data sources see[4]



References