X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275050711000

Well Details

Well ID: 0275050711000
Loading map...
Location: 00/11-07-027-05W5/0
Location Alias: 00/11-07-27-05 W5M
Location Alias 2: 00/11-07-027-05 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 05
Section: 07
County/Municipality: Rocky View County
Well Name: Canlin WCATH 11-7-27-5
Operator Name: Canlin Energy Corporation
License Number: 0020571
License Date: 1961-03-17
License Status: Suspension
Spud Date: 1961-05-28
Final Drill Date: 1961-11-17
Well Total Depth: 2920.30 m
Surface Hole Latitude: 51.292678
Surface Hole Longitude: -114.699784

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-03-17 Obtained License
1961-05-28 Direction Drilling Operation Performed - 98
1961-11-05 Production Casing Operation Performed
1961-11-17 Finished Drilling
1961-11-17 Perforation Treatment Performed - Open-Hole Completion
1961-11-17 Well Mode changed to Drilled and Cased
1961-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-01 Perforation Treatment Performed - Jet Perforation
1962-01-03 Drill Stem Test Performed
1962-01-04 Drill Stem Test Performed
1962-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-02 Well Began Production
1962-06-02 Well Fluid changed to Gas
1962-06-02 Well Mode changed to Flowing
1965-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-06-29 Perforation Treatment Performed - Condensate Squeeze
2003-11-04 Well Log Performed
2003-11-05 Well Log Performed
2003-11-08 Well Log Performed
2003-11-15 Well Log Performed
2003-11-19 Well Log Performed
2003-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-21 Perforation Treatment Performed - Cement Squeeze
2003-11-21 Plug Back Performed
2003-11-21 Well Fluid changed to Gas
2003-11-21 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1961-05-28 824.80 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-11-17 Open Hole/Barefoot Completion 2865.10 2920.30 0
2003-11-21 Packing Device Capped w/Cement 2797.00 2828.00 0
1961-11-30 Acid Treatment 2865.10 2920.30 0
1961-12-11 Acid Treatment 2865.10 2920.30 0
1962-01-01 Perforation 2845.60 2857.20 13
1962-01-20 Acid Treatment 2865.10 2920.30 0
1962-01-28 Acid Treatment 2865.10 2920.30 0
1965-06-29 Acid Treatment 2845.60 2920.30 0
1965-06-29 Condensate Squeeze 2845.60 2920.30 0
2003-11-21 Cement Squeeze 2845.60 2857.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 8576 0.0 0.0 0.0
1970 8667 0.0 0.0 0.0
1971 8518 0.0 0.0 0.0
1972 4211 0.0 0.0 0.0
1973 5108 0.0 0.0 0.0
1974 4476 0.0 0.0 0.0
1975 3655 0.0 0.0 0.0
1976 1331 0.0 0.0 0.0
1977 992 0.0 0.0 0.0
1978 222 0.0 0.0 0.0
1979 1078 0.0 0.0 0.0
1980 772 0.0 0.0 0.0
1981 37 0.0 0.0 0.0
1982 48 0.0 0.0 0.0
1983 42 0.0 0.0 0.0
1984 182 0.0 0.0 0.0
1985 1266 0.0 0.0 0.0
1986 620 0.0 0.0 0.0
1987 2142 0.0 0.0 0.0
1988 4019 0.0 0.0 0.0
1989 4054 0.0 0.0 0.0
1990 1135 0.0 0.0 0.0
1991 336 0.0 0.0 0.0
1992 6264 0.0 0.0 0.0
1993 7119 0.0 0.0 0.0
1994 8545 0.0 0.0 0.0
1995 6872 0.0 0.0 0.0
1996 1703 0.0 0.0 0.0
1997 3221 0.0 0.0 0.0

For data sources see[6]

References