X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275050615000

Well Details

Well ID: 0275050615000
Loading map...
Location: 00/15-06-027-05W5/0
Location Alias: 00/15-06-27-05 W5M
Location Alias 2: 00/15-06-027-05 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 05
Section: 06
County/Municipality: Rocky View County
Well Name: Canlin WCATH 15-6-27-5
Operator Name: Canlin Energy Corporation
License Number: 0030723
License Date: 1966-07-21
License Status: Issued
Spud Date: 1966-07-23
Final Drill Date: 1966-10-08
Well Total Depth: 3188.20 m
Surface Hole Latitude: 51.281319
Surface Hole Longitude: -114.690126

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-07-21 Obtained License
1966-10-08 Finished Drilling
1966-10-08 Well Mode changed to Drilled and Cased
1966-10-09 Production Casing Operation Performed
1966-10-16 Perforation Treatment Performed - Selective Jet Perforations
1967-01-06 Well Began Production
1967-01-06 Well Fluid changed to Gas
1967-01-06 Well Mode changed to Flowing
1988-12-13 Perforation Treatment Performed - Jet Perforation
1988-12-14 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-10-16 Selective Jet Perforations 3067.50 3069.00 0
1966-10-16 Selective Jet Perforations 3141.60 3144.30 0
1966-10-16 Selective Jet Perforations 3146.80 3150.10 0
1966-10-16 Selective Jet Perforations 3153.50 3154.70 0
1966-10-16 Selective Jet Perforations 3158.30 3158.30 0
1988-12-13 Perforation 3124.00 3160.00 3
1988-12-14 Perforation 3088.00 3124.00 3
1966-10-16 Selective Jet Perforations 3070.90 3098.90 0
1966-10-16 Selective Jet Perforations 3105.00 3106.20 0
1966-10-16 Selective Jet Perforations 3108.00 3117.80 0
1966-10-16 Selective Jet Perforations 3120.20 3120.80 0
1966-10-16 Selective Jet Perforations 3123.60 3124.80 0
1966-10-16 Selective Jet Perforations 3126.60 3128.50 0
1966-10-16 Selective Jet Perforations 3130.30 3133.30 0
1966-10-16 Selective Jet Perforations 3134.90 3137.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 7708 0.0 0.0 0.0
1970 7760 0.0 0.0 0.0
1971 8325 0.0 0.0 0.0
1972 8407 0.0 0.0 0.0
1973 8134 0.0 0.0 0.0
1974 8158 0.0 0.0 0.0
1975 8361 0.0 0.0 0.0
1976 8143 0.0 0.0 0.0
1977 8153 0.0 0.0 0.0
1978 3823 0.0 0.0 0.0
1979 5047 0.0 0.0 0.0
1980 4888 0.0 0.0 0.0
1981 2238 0.0 0.0 0.0
1982 1022 0.0 0.0 0.0
1983 2375 0.0 0.0 0.0
1984 3718 0.0 0.0 0.0
1985 4148 0.0 0.0 0.0
1986 2675 0.0 0.0 0.0
1987 4901 0.0 0.0 0.0
1988 7443 0.0 0.0 0.0
1989 6642 0.0 0.0 0.0
1990 6649 0.0 0.0 0.0
1991 5191 0.0 0.0 0.0
1992 8002 0.0 0.0 0.0
1993 7990 0.0 0.0 0.0
1994 8706 0.0 0.0 0.0
1995 8156 0.0 0.0 0.0
1996 8707 0.0 0.0 0.0
1997 8463 0.0 0.0 0.0
1998 6713 0.0 0.0 0.0
1999 7565 0.0 0.0 0.0
2000 7973 0.0 0.0 0.0
2001 7437 0.0 0.0 0.0
2002 7565 0.0 0.0 0.0
2003 7349 0.0 0.0 0.0
2004 6338 0.0 0.0 0.0
2005 7978 0.0 0.0 0.0
2006 8304 0.0 0.0 0.0
2007 8301 0.0 0.0 0.0
2008 8334 0.0 0.0 0.0
2009 7854 0.0 0.0 0.0
2010 7799 0.0 0.0 0.0
2011 8491 0.0 0.0 0.0
2012 8699 0.0 0.0 0.0
2013 7549 0.0 0.0 0.0
2014 8601 0.0 0.0 0.0
2015 8749 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 7500 0.0 0.0 0.0
2018 4484 0.0 0.0 0.0
2019 3954 0.0 0.0 0.0
2020 1011 0.0 0.0 0.0

For data sources see[5]

References