X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275042616000

Well Details

Well ID: 0275042616000
Loading map...
Location: 00/16-26-027-04W5/0
Location Alias: 00/16-26-27-04 W5M
Location Alias 2: 00/16-26-027-04 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 04
Section: 26
County/Municipality: Rocky View County
Well Name: TRIOIL HZ COCHRANE 16-26-27-4
Operator Name: ORLEN Upstream Canada Ltd.
License Number: 0432121
License Date: 2011-03-04
License Status: Issued
Spud Date: 2011-03-12
Final Drill Date: 2011-04-02
Well Total Depth: 3640.00 m
Surface Hole Latitude: 51.331631
Surface Hole Longitude: -114.450125

For data sources see[1][2]

Well History

Date Event
2011-03-04 Obtained License
2011-03-14 Surface Casing Operation Performed
2011-03-21 Direction Drilling Operation Performed - Horizontal
2011-03-27 Well Log Performed
2011-03-28 Production Casing Operation Performed
2011-04-02 Finished Drilling
2011-04-02 Well Mode changed to Drilled and Cased
2011-04-04 Well Log Performed
2011-04-06 Liner Casing Operation Performed
2011-04-06 Perforation Treatment Performed - Slotted Liner or Casing
2011-04-06 Rig Released
2011-07-07 Perforation Treatment Performed - Multi-Stage Fracture
2011-07-07 Perforation Treatment Performed - Open-Hole Completion
2011-07-08 Perforation Treatment Performed - Multi-Stage Fracture
2011-07-10 Well Began Production
2011-07-10 Well Fluid changed to Crude Oil
2011-07-10 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-03-21 2155.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-04-06 Slotted Liner 2459.00 3640.00 0
2011-07-08 Multi-Stage Fracture 3207.70 3207.80 0
2011-07-08 Multi-Stage Fracture 3144.90 3145.00 0
2011-07-08 Multi-Stage Fracture 3093.50 3093.60 0
2011-07-08 Multi-Stage Fracture 3030.90 3031.00 0
2011-07-08 Multi-Stage Fracture 2979.50 2979.60 0
2011-07-08 Multi-Stage Fracture 2916.70 2916.80 0
2011-07-08 Multi-Stage Fracture 2865.90 2866.00 0
2011-07-08 Multi-Stage Fracture 2803.00 2803.10 0
2011-07-08 Multi-Stage Fracture 2751.70 2751.80 0
2011-07-08 Multi-Stage Fracture 2688.90 2689.00 0
2011-07-07 Open Hole/Barefoot Completion 3635.00 3640.00 0
2011-07-08 Multi-Stage Fracture 2638.00 2638.10 0
2011-07-08 Multi-Stage Fracture 2574.70 2574.80 0
2011-07-08 Multi-Stage Fracture 2523.20 2523.30 0
2011-07-07 Multi-Stage Fracture 3614.30 3614.40 0
2011-07-07 Multi-Stage Fracture 3549.30 3549.40 0
2011-07-07 Multi-Stage Fracture 3498.10 3498.20 0
2011-07-07 Multi-Stage Fracture 3435.50 3435.60 0
2011-07-07 Multi-Stage Fracture 3384.20 3384.30 0
2011-07-07 Multi-Stage Fracture 3321.40 3321.50 0
2011-07-08 Multi-Stage Fracture 3258.70 3258.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 3761 0.0 0.0 0.0
2012 7700 0.0 0.0 0.0
2013 7142 0.0 0.0 0.0
2014 8250 0.0 0.0 0.0
2015 6789 0.0 0.0 0.0
2016 1368 0.0 0.0 0.0
2017 4848 0.0 0.0 0.0
2018 8005 0.0 0.0 0.0
2019 8016 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References