X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275042615000

Well Details

Well ID: 0275042615000
Loading map...
Location: 00/15-26-027-04W5/0
Location Alias: 00/15-26-27-04 W5M
Location Alias 2: 00/15-26-027-04 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 04
Section: 26
County/Municipality: Rocky View County
Well Name: TRIOIL ET AL HZ COCHRANE 15-26-27-4
Operator Name: ORLEN Upstream Canada Ltd.
License Number: 0442282
License Date: 2012-01-04
License Status: Suspension
Spud Date: 2012-01-11
Final Drill Date: 2012-01-25
Well Total Depth: 3670.00 m
Surface Hole Latitude: 51.331632
Surface Hole Longitude: -114.450555

For data sources see[1][2]

Well History

Date Event
2012-01-04 Obtained License
2012-01-13 Surface Casing Operation Performed
2012-01-17 Direction Drilling Operation Performed - Horizontal
2012-01-18 Well Log Performed
2012-01-25 Finished Drilling
2012-01-25 Well Log Performed
2012-01-25 Well Mode changed to Drilled and Cased
2012-01-27 Liner Casing Operation Performed
2012-01-27 Production Casing Operation Performed
2012-01-28 Rig Released
2012-02-01 Well Log Performed
2012-02-10 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-20 Well Began Production
2012-02-20 Well Fluid changed to Crude Oil
2012-02-20 Well Mode changed to Flowing
2016-03-01 Well Fluid changed to Crude Oil
2016-03-01 Well Mode changed to Suspended
2017-03-13 Well Fluid changed to Crude Oil
2017-03-13 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-11 Ensign Drilling Inc. 511 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-17 2067.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-10 Multi-Stage Fracture 3637.30 3637.40 0
2012-02-10 Multi-Stage Fracture 2995.90 2996.00 0
2012-02-10 Multi-Stage Fracture 2932.90 2933.00 0
2012-02-10 Multi-Stage Fracture 2870.10 2870.20 0
2012-02-10 Multi-Stage Fracture 2807.50 2807.60 0
2012-02-10 Multi-Stage Fracture 2744.90 2745.00 0
2012-02-10 Multi-Stage Fracture 2682.30 2682.40 0
2012-02-10 Multi-Stage Fracture 2620.50 2620.60 0
2012-02-10 Multi-Stage Fracture 3557.90 3558.00 0
2012-02-10 Multi-Stage Fracture 3481.00 3481.10 0
2012-02-10 Multi-Stage Fracture 3404.30 3404.40 0
2012-02-10 Multi-Stage Fracture 3330.60 3330.70 0
2012-02-10 Multi-Stage Fracture 3253.70 3253.80 0
2012-02-10 Multi-Stage Fracture 3186.30 3186.40 0
2012-02-10 Multi-Stage Fracture 3120.30 3120.40 0
2012-02-10 Multi-Stage Fracture 3058.40 3058.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6714 0.0 0.0 0.0
2013 7509 0.0 0.0 0.0
2014 5539 0.0 0.0 0.0
2017 6557 0.0 0.0 0.0
2018 8581 0.0 0.0 0.0
2019 2088 0.0 0.0 0.0

For data sources see[7]

References