X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275031104000

Well Details

Well ID: 0275031104000
Loading map...
Location: 00/04-11-027-03W5/0
Location Alias: 00/04-11-27-03 W5M
Location Alias 2: 00/04-11-027-03 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 03
Section: 11
County/Municipality: Rocky View County
Well Name: RIDGEBACK LOCHEND 4-11-27-3
Operator Name: Ridgeback Resources Inc.
License Number: 0426092
License Date: 2010-11-19
License Status: Issued
Spud Date: 2010-12-07
Final Drill Date: 2011-01-01
Well Total Depth: 3373.00 m
Surface Hole Latitude: 51.298555
Surface Hole Longitude: -114.331052

For data sources see[1][2]

Well History

Date Event
2010-11-19 Obtained License
2010-12-08 Surface Casing Operation Performed
2010-12-12 Direction Drilling Operation Performed - Horizontal
2010-12-15 Intermediate Casing Operation Performed
2011-01-01 Finished Drilling
2011-01-01 Perforation Treatment Performed - Open-Hole Completion
2011-01-01 Well Log Performed
2011-01-01 Well Mode changed to Drilled and Cased
2011-01-02 Liner Casing Operation Performed
2011-01-03 Rig Released
2011-01-22 Well Log Performed
2011-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-13 Well Began Production
2011-02-13 Well Fluid changed to Crude Oil
2011-02-13 Well Mode changed to Pumping
2015-10-01 Well Fluid changed to Crude Oil
2015-10-01 Well Mode changed to Suspended
2019-04-10 Well Fluid changed to Crude Oil
2019-04-10 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-12 1867.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-01 Open Hole/Barefoot Completion 3369.00 3373.00 0
2011-02-08 Multi-Stage Fracture 2952.80 2952.90 0
2011-02-08 Multi-Stage Fracture 2904.50 2904.60 0
2011-02-08 Multi-Stage Fracture 2854.10 2854.20 0
2011-02-08 Multi-Stage Fracture 2803.50 2803.60 0
2011-02-09 Multi-Stage Fracture 2763.70 2763.80 0
2011-02-09 Multi-Stage Fracture 2713.90 2714.00 0
2011-02-09 Multi-Stage Fracture 2663.80 2663.90 0
2011-02-09 Multi-Stage Fracture 2613.60 2613.70 0
2011-02-09 Multi-Stage Fracture 2563.70 2563.80 0
2011-02-09 Multi-Stage Fracture 2524.70 2524.80 0
2011-02-08 Multi-Stage Fracture 3333.30 3333.40 0
2011-02-09 Multi-Stage Fracture 2475.40 2475.50 0
2011-02-09 Multi-Stage Fracture 2425.70 2425.80 0
2011-02-08 Multi-Stage Fracture 3283.50 3283.60 0
2011-02-08 Multi-Stage Fracture 3244.20 3244.30 0
2011-02-08 Multi-Stage Fracture 3194.90 3195.00 0
2011-02-08 Multi-Stage Fracture 3144.20 3144.30 0
2011-02-08 Multi-Stage Fracture 3092.60 3092.70 0
2011-02-08 Multi-Stage Fracture 3053.00 3053.10 0
2011-02-08 Multi-Stage Fracture 3002.70 3002.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6580 0.0 0.0 0.0
2012 8493 0.0 0.0 0.0
2013 8530 0.0 0.0 0.0
2014 4145 0.0 0.0 0.0
2019 6375 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References