X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275030413000

Well Details

Well ID: 0275030413000
Loading map...
Location: 00/13-04-027-03W5/0
Location Alias: 00/13-04-27-03 W5M
Location Alias 2: 00/13-04-027-03 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 03
Section: 04
County/Municipality: Rocky View County
Well Name: NAL LOCHEND 13-4-27-3
Operator Name: NAL Resources Limited
License Number: 0438005
License Date: 2011-10-25
License Status: Amended
Spud Date: 2012-04-01
Final Drill Date: 2012-04-19
Well Total Depth: 3605.00 m
Surface Hole Latitude: 51.272731
Surface Hole Longitude: -114.367337

For data sources see[1][2]

Well History

Date Event
2011-10-25 Obtained License
2012-04-04 Surface Casing Operation Performed
2012-04-08 Direction Drilling Operation Performed - Horizontal
2012-04-14 Intermediate Casing Operation Performed
2012-04-19 Finished Drilling
2012-04-19 Well Mode changed to Drilled and Cased
2012-04-23 Perforation Treatment Performed - Open-Hole Completion
2012-04-24 Liner Casing Operation Performed
2012-04-24 Well Log Performed
2012-04-25 Rig Released
2012-07-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-16 Well Began Production
2012-07-16 Well Fluid changed to Crude Oil
2012-07-16 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-04-08 2311.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-04-23 Open Hole/Barefoot Completion 3600.00 3605.00 0
2012-07-15 Multi-Stage Fracture 2839.20 2839.30 0
2012-07-15 Multi-Stage Fracture 2766.40 2766.50 0
2012-07-15 Multi-Stage Fracture 2693.60 2693.70 0
2012-07-15 Multi-Stage Fracture 2620.80 2620.90 0
2012-07-15 Multi-Stage Fracture 2548.00 2548.10 0
2012-07-15 Multi-Stage Fracture 2488.70 2488.80 0
2012-07-15 Multi-Stage Fracture 2429.40 2429.50 0
2012-07-15 Multi-Stage Fracture 3577.20 3577.30 0
2012-07-15 Multi-Stage Fracture 3524.60 3524.70 0
2012-07-15 Multi-Stage Fracture 3343.60 3343.70 0
2012-07-15 Multi-Stage Fracture 3284.30 3284.40 0
2012-07-15 Multi-Stage Fracture 3184.40 3184.50 0
2012-07-15 Multi-Stage Fracture 3098.10 3098.20 0
2012-07-15 Multi-Stage Fracture 3011.80 3011.90 0
2012-07-15 Multi-Stage Fracture 2925.50 2925.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3455 0.0 0.0 0.0
2013 7330 0.0 0.0 0.0
2014 7020 0.0 0.0 0.0
2015 8546 0.0 0.0 0.0
2016 7906 0.0 0.0 0.0
2017 8627 0.0 0.0 0.0
2018 8238 0.0 0.0 0.0
2019 8260 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-25 No Incident Encountered 0.00 0.00
2012-07-24 No Incident Encountered 0.00 0.00

For data sources see[7]

References