X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275021014000

Well Details

Well ID: 0275021014000
Loading map...
Location: 00/14-10-027-02W5/0
Location Alias: 00/14-10-27-02 W5M
Location Alias 2: 00/14-10-027-02 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 02
Section: 10
County/Municipality: Rocky View County
Well Name: APL ET AL CROSSFIELD 14-10-27-2
Operator Name: Pengrowth Acquisition Corporation
License Number: 0134577
License Date: 1988-06-27
License Status: Re-Entered
Spud Date: 1988-07-09
Final Drill Date: 1988-07-31
Well Total Depth: 2630.00 m
Surface Hole Latitude: 51.297869
Surface Hole Longitude: -114.204057

For data sources see[1][2]

Well History

Date Event
1988-06-27 Obtained License
1988-07-10 Surface Casing Operation Performed
1988-07-30 Drill Stem Test Performed
1988-07-31 Finished Drilling
1988-07-31 Well Mode changed to Drilled and Cased
1988-08-01 Well Log Performed
1988-08-04 Production Casing Operation Performed
1988-08-04 Rig Released
1988-08-12 Perforation Treatment Performed - Jet Perforation
1988-08-12 Well Log Performed
1988-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-14 Well Began Production
1988-08-14 Well Fluid changed to Crude Oil
1988-08-14 Well Mode changed to Pumping
1988-09-28 Perforation Treatment Performed - Jet Perforation
1988-09-28 Well Log Performed
1988-09-29 Well Log Performed
1988-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-12-01 Well Fluid changed to Crude Oil
1988-12-01 Well Mode changed to Suspended
1989-07-25 Well Fluid changed to Crude Oil
1989-07-25 Well Mode changed to Pumping
1993-06-01 Well Fluid changed to Crude Oil
1993-06-01 Well Mode changed to Suspended
1995-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-27 Perforation Treatment Performed - Jet Perforation
1995-08-27 Perforation Treatment Performed - Remedial Casing
1995-08-27 Plug Back Performed
1995-08-27 Well Fluid changed to Crude Oil
1995-08-27 Well Log Performed
1995-08-27 Well Mode changed to Abandoned and Re-entered
1995-09-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-08-12 Perforation 2608.00 2611.00 13
1988-08-13 Acid Treatment 2608.00 2611.00 0
1988-09-28 Perforation 2604.00 2606.00 13
1988-09-28 Perforation 2613.00 2615.00 13
1988-09-30 Acid Treatment 2604.00 2615.00 0
1995-08-27 Packing Device Capped w/Cement 2587.00 2595.00 0
1995-08-27 Perforation 481.00 482.00 14
1995-08-27 Remedial Casing Cementing 481.00 482.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1357 0.0 0.0 0.0
1989 3221 0.0 0.0 0.0
1990 8036 0.0 0.0 0.0
1991 7609 0.0 0.0 0.0
1992 4518 0.0 0.0 0.0
1993 967 0.0 0.0 0.0

For data sources see[5]

References