X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274282316000

Well Details

Well ID: 0274282316000
Loading map...
Location: 00/16-23-027-28W4/0
Location Alias: 00/16-23-27-28 W4M
Location Alias 2: 00/16-23-027-28 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 28
Section: 23
County/Municipality: Rocky View County
Well Name: EMBER CROSS 16-23-27-28
Operator Name: Ember Resources Inc.
License Number: 0408194
License Date: 2009-01-20
License Status: Suspension
Spud Date: 2009-10-13
Final Drill Date: 2009-10-14
Well Total Depth: 1258.00 m
Surface Hole Latitude: 51.328066
Surface Hole Longitude: -113.827645

For data sources see[1][2]

Well History

Date Event
2009-01-20 Obtained License
2009-10-13 Lost Circulation Occurred
2009-10-13 Surface Casing Operation Performed
2009-10-14 Finished Drilling
2009-10-14 Well Mode changed to Drilled and Cased
2009-10-15 Production Casing Operation Performed
2009-10-15 Rig Released
2009-10-26 Well Log Performed
2009-11-17 Perforation Treatment Performed - Jet Perforation
2009-12-10 Perforation Treatment Performed - Fractured
2009-12-14 Well Fluid changed to Coalbed Methane-Coals and Other
2009-12-14 Well Mode changed to Testing
2009-12-18 Well Began Production
2009-12-18 Well Fluid changed to Coalbed Methane-Coals and Other
2009-12-18 Well Mode changed to Flowing
2019-01-01 Well Fluid changed to Coalbed Methane-Coals and Other
2019-01-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-11-17 Perforation 537.20 537.70 13
2009-11-17 Perforation 267.00 270.00 13
2009-11-17 Perforation 637.00 639.00 13
2009-11-17 Perforation 729.00 731.00 13
2009-11-17 Perforation 690.00 692.00 13
2009-11-17 Perforation 658.00 659.00 13
2009-11-17 Perforation 822.60 823.10 13
2009-11-17 Perforation 814.10 814.60 13
2009-11-17 Perforation 810.30 811.30 13
2009-11-17 Perforation 851.00 853.00 13
2009-11-17 Perforation 843.00 843.50 13
2009-11-17 Perforation 467.90 468.40 13
2009-11-17 Perforation 828.00 828.50 13
2009-11-17 Perforation 807.80 809.80 13
2009-11-17 Perforation 684.80 685.30 13
2009-11-17 Perforation 743.90 744.40 13
2009-11-17 Perforation 741.50 742.00 13
2009-11-17 Perforation 755.50 756.00 13
2009-11-17 Perforation 790.60 791.10 13
2009-11-17 Perforation 774.30 776.30 13
2009-12-10 Fracture 267.00 270.00 0
2009-12-10 Fracture 397.90 843.50 0
2009-11-17 Perforation 397.90 398.40 13
2009-12-10 Fracture 851.00 853.00 0
2009-11-17 Perforation 540.50 541.00 13
2009-11-17 Perforation 677.40 677.90 13
2009-11-17 Perforation 619.00 619.50 13
2009-11-17 Perforation 550.60 551.60 13
2009-11-17 Perforation 577.00 579.00 13
2009-11-17 Perforation 481.00 483.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 340 0.0 0.0 0.0
2010 8743 0.0 0.0 0.0
2011 8753 0.0 0.0 0.0
2012 8782 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8740 0.0 0.0 0.0
2015 7813 0.0 0.0 0.0
2018 720 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-10-13 Lost Circulation 60.00 63.00

For data sources see[6]

References