If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274280408000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.276756,"lon":-113.877096,"icon":""}]} |
Location: 00/08-04-027-28W4/0 | |
Location Alias: 00/08-04-27-28 W4M | |
Location Alias 2: 00/08-04-027-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 28 | |
Section: 04 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSS 8-4-27-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0410944 | |
License Date: 2009-06-12 | |
License Status: Issued | |
Spud Date: 2009-11-28 | |
Final Drill Date: 2009-12-02 | |
Well Total Depth: 1305.00 m | |
Surface Hole Latitude: 51.276756 | |
Surface Hole Longitude: -113.877096 |
Date | Event |
---|---|
2009-06-12 | Obtained License |
2009-11-28 | Surface Casing Operation Performed |
2009-12-02 | Finished Drilling |
2009-12-02 | Production Casing Operation Performed |
2009-12-02 | Rig Released |
2009-12-02 | Well Mode changed to Drilled and Cased |
2009-12-07 | Well Log Performed |
2010-01-19 | Perforation Treatment Performed - Jet Perforation |
2010-02-02 | Well Fluid changed to Gas |
2010-02-02 | Well Mode changed to Testing |
2010-05-01 | Well Fluid changed to Gas |
2010-05-01 | Well Mode changed to Test Completed |
2010-08-28 | Perforation Treatment Performed - Fractured |
2010-09-02 | Well Fluid changed to Gas |
2010-09-02 | Well Mode changed to Testing |
2010-09-12 | Perforation Treatment Performed - Jet Perforation |
2010-09-25 | Perforation Treatment Performed - Fractured |
2010-10-13 | Well Began Production |
2010-10-13 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-10-13 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-19 | Perforation | 1265.00 | 1266.00 | 13 |
2010-09-12 | Perforation | 786.70 | 787.20 | 13 |
2010-09-12 | Perforation | 782.30 | 782.80 | 13 |
2010-09-12 | Perforation | 763.80 | 764.30 | 13 |
2010-09-12 | Perforation | 509.90 | 510.40 | 13 |
2010-09-12 | Perforation | 598.00 | 600.00 | 13 |
2010-09-12 | Perforation | 570.00 | 572.00 | 13 |
2010-09-12 | Perforation | 478.00 | 480.00 | 13 |
2010-09-12 | Perforation | 505.80 | 506.30 | 13 |
2010-09-12 | Perforation | 496.90 | 497.40 | 13 |
2010-09-12 | Perforation | 602.00 | 604.00 | 13 |
2010-01-19 | Perforation | 749.00 | 752.00 | 13 |
2010-09-12 | Perforation | 828.20 | 828.70 | 13 |
2010-09-12 | Perforation | 936.30 | 937.30 | 13 |
2010-09-12 | Perforation | 933.70 | 934.70 | 13 |
2010-09-12 | Perforation | 916.00 | 917.00 | 13 |
2010-09-12 | Perforation | 964.50 | 965.00 | 13 |
2010-09-12 | Perforation | 958.00 | 958.50 | 13 |
2010-09-12 | Perforation | 951.30 | 951.80 | 13 |
2010-09-12 | Perforation | 912.80 | 913.80 | 13 |
2010-09-12 | Perforation | 860.10 | 861.10 | 13 |
2010-09-12 | Perforation | 849.30 | 849.80 | 13 |
2010-01-19 | Perforation | 691.00 | 693.00 | 13 |
2010-09-12 | Perforation | 846.20 | 846.70 | 13 |
2010-09-12 | Perforation | 876.20 | 878.20 | 13 |
2010-09-12 | Perforation | 893.30 | 893.80 | 13 |
2010-09-12 | Perforation | 884.80 | 885.30 | 13 |
2010-09-25 | Fracture | 478.00 | 604.00 | 0 |
2010-09-25 | Fracture | 496.90 | 965.00 | 0 |
2010-01-19 | Perforation | 682.00 | 684.00 | 13 |
2010-08-28 | Fracture | 749.00 | 751.00 | 0 |
2010-08-28 | Fracture | 1265.00 | 1266.00 | 0 |
2010-09-12 | Perforation | 642.00 | 642.50 | 13 |
2010-09-12 | Perforation | 638.40 | 638.90 | 13 |
2010-09-12 | Perforation | 565.90 | 566.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 1972 | 0.0 | 0.0 | 0.0 |
2011 | 8755 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8723 | 0.0 | 0.0 | 0.0 |
2016 | 8690 | 0.0 | 0.0 | 0.0 |
2017 | 8690 | 0.0 | 0.0 | 0.0 |
2018 | 8622 | 0.0 | 0.0 | 0.0 |
2019 | 8540 | 0.0 | 0.0 | 0.0 |
2020 | 2167 | 0.0 | 0.0 | 0.0 |
For data sources see[5]