If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274280204000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.271807,"lon":-113.844645,"icon":""}]} |
Location: 00/04-02-027-28W4/0 | |
Location Alias: 00/04-02-27-28 W4M | |
Location Alias 2: 00/04-02-027-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 28 | |
Section: 02 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSS 4-2-27-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0407570 | |
License Date: 2009-01-09 | |
License Status: Amended | |
Spud Date: 2009-11-14 | |
Final Drill Date: 2009-11-25 | |
Well Total Depth: 1219.00 m | |
Surface Hole Latitude: 51.271807 | |
Surface Hole Longitude: -113.844645 |
Date | Event |
---|---|
2009-01-09 | Obtained License |
2009-11-14 | Surface Casing Operation Performed |
2009-11-25 | Finished Drilling |
2009-11-25 | Well Log Performed |
2009-11-25 | Well Mode changed to Drilled and Cased |
2009-11-26 | Production Casing Operation Performed |
2009-11-26 | Rig Released |
2009-12-02 | Well Log Performed |
2010-01-06 | Perforation Treatment Performed - Jet Perforation |
2010-01-23 | Well Fluid changed to Gas |
2010-01-23 | Well Mode changed to Testing |
2010-02-13 | Perforation Treatment Performed - Fractured |
2010-03-01 | Well Began Production |
2010-03-01 | Well Fluid changed to Gas |
2010-03-01 | Well Mode changed to Flowing |
2011-02-15 | Perforation Treatment Performed - Jet Perforation |
2011-02-16 | Perforation Treatment Performed - Fractured |
2011-04-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-04-12 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-06 | Perforation | 1135.00 | 1136.00 | 13 |
2011-02-15 | Perforation | 490.20 | 491.20 | 13 |
2011-02-15 | Perforation | 558.20 | 558.30 | 13 |
2011-02-15 | Perforation | 705.70 | 706.20 | 13 |
2011-02-15 | Perforation | 702.00 | 702.50 | 13 |
2011-02-15 | Perforation | 691.80 | 692.80 | 13 |
2011-02-15 | Perforation | 611.00 | 613.00 | 13 |
2011-02-15 | Perforation | 590.00 | 592.00 | 13 |
2011-02-15 | Perforation | 534.00 | 536.00 | 13 |
2011-02-15 | Perforation | 660.00 | 662.00 | 13 |
2011-02-15 | Perforation | 432.60 | 433.10 | 13 |
2010-01-06 | Perforation | 1111.00 | 1113.00 | 13 |
2011-02-15 | Perforation | 431.00 | 432.00 | 13 |
2011-02-15 | Perforation | 415.30 | 415.80 | 13 |
2011-02-15 | Perforation | 853.00 | 853.50 | 13 |
2011-02-15 | Perforation | 840.10 | 841.10 | 13 |
2011-02-15 | Perforation | 836.30 | 837.30 | 13 |
2011-02-15 | Perforation | 876.30 | 876.80 | 13 |
2011-02-15 | Perforation | 857.10 | 859.60 | 13 |
2011-02-15 | Perforation | 869.50 | 870.00 | 13 |
2011-02-15 | Perforation | 874.20 | 874.70 | 13 |
2011-02-15 | Perforation | 798.20 | 800.70 | 13 |
2010-01-06 | Perforation | 1099.00 | 1100.00 | 13 |
2011-02-15 | Perforation | 769.20 | 770.20 | 13 |
2011-02-15 | Perforation | 771.80 | 772.80 | 13 |
2011-02-15 | Perforation | 781.10 | 782.60 | 13 |
2011-02-15 | Perforation | 831.90 | 832.90 | 13 |
2011-02-15 | Perforation | 809.00 | 809.50 | 13 |
2011-02-15 | Perforation | 815.60 | 816.60 | 13 |
2011-02-16 | Fracture | 590.00 | 662.00 | 0 |
2011-02-16 | Fracture | 534.00 | 536.00 | 0 |
2011-02-16 | Fracture | 831.90 | 832.90 | 0 |
2011-02-16 | Fracture | 853.00 | 853.50 | 0 |
2010-01-06 | Perforation | 1064.00 | 1066.00 | 13 |
2011-02-16 | Fracture | 869.50 | 876.80 | 0 |
2011-02-16 | Fracture | 415.30 | 491.20 | 0 |
2011-02-16 | Fracture | 547.40 | 558.30 | 0 |
2011-02-16 | Fracture | 691.80 | 800.70 | 0 |
2010-01-06 | Perforation | 1009.00 | 1011.00 | 13 |
2010-02-13 | Fracture | 1135.00 | 1136.00 | 0 |
2010-02-13 | Fracture | 1009.00 | 1011.00 | 0 |
2011-02-15 | Perforation | 555.70 | 556.20 | 13 |
2011-02-15 | Perforation | 547.40 | 547.90 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7403 | 0.0 | 0.0 | 0.0 |
2011 | 8755 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8723 | 0.0 | 0.0 | 0.0 |
2016 | 8690 | 0.0 | 0.0 | 0.0 |
2017 | 8690 | 0.0 | 0.0 | 0.0 |
2018 | 8622 | 0.0 | 0.0 | 0.0 |
2019 | 8540 | 0.0 | 0.0 | 0.0 |
2020 | 2167 | 0.0 | 0.0 | 0.0 |
For data sources see[5]