X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274272009000

Well Details

Well ID: 0274272009000
Loading map...
Location: 00/09-20-027-27W4/0
Location Alias: 00/09-20-27-27 W4M
Location Alias 2: 00/09-20-027-27 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 27
Section: 20
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 9-20-27-27
Operator Name: Ember Resources Inc.
License Number: 0405313
License Date: 2008-12-04
License Status: Issued
Spud Date: 2009-01-20
Final Drill Date: 2009-01-22
Well Total Depth: 1465.00 m
Surface Hole Latitude: 51.329618
Surface Hole Longitude: -113.759691

For data sources see[1][2]

Well History

Date Event
2008-12-04 Obtained License
2009-01-20 Direction Drilling Operation Performed - Deviate
2009-01-20 Surface Casing Operation Performed
2009-01-22 Finished Drilling
2009-01-22 Production Casing Operation Performed
2009-01-22 Rig Released
2009-01-22 Well Mode changed to Drilled and Cased
2009-01-30 Well Log Performed
2009-02-16 Perforation Treatment Performed - Jet Perforation
2009-03-29 Well Began Production
2009-03-29 Well Fluid changed to Gas
2009-03-29 Well Mode changed to Flowing
2009-06-08 Perforation Treatment Performed - Jet Perforation
2009-06-11 Perforation Treatment Performed - Fractured
2009-06-22 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-01-20 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-16 Perforation 400.00 403.00 13
2009-06-08 Perforation 903.20 903.70 13
2009-06-08 Perforation 891.30 894.30 13
2009-06-08 Perforation 866.00 868.00 13
2009-06-08 Perforation 860.80 861.80 13
2009-06-08 Perforation 858.00 858.50 13
2009-06-08 Perforation 789.00 789.50 13
2009-06-08 Perforation 784.40 784.90 13
2009-06-08 Perforation 779.80 780.30 13
2009-06-08 Perforation 690.00 690.50 13
2009-06-08 Perforation 628.20 628.70 13
2009-06-08 Perforation 981.50 982.00 13
2009-06-08 Perforation 619.50 620.50 13
2009-06-08 Perforation 604.30 604.80 13
2009-06-08 Perforation 599.90 600.40 13
2009-06-08 Perforation 584.20 585.20 13
2009-06-08 Perforation 557.40 557.90 13
2009-06-08 Perforation 556.20 556.70 13
2009-06-08 Perforation 458.30 458.80 13
2009-06-11 Fracture 458.30 982.00 0
2009-06-08 Perforation 969.00 969.50 13
2009-06-08 Perforation 965.30 966.30 13
2009-06-08 Perforation 944.00 944.50 13
2009-06-08 Perforation 938.70 939.20 13
2009-06-08 Perforation 932.10 932.60 13
2009-06-08 Perforation 929.10 929.60 13
2009-06-08 Perforation 910.40 910.90 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 2256 0.0 0.0 0.0

For data sources see[6]

References