X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274262501000

Well Details

Well ID: 0274262501000
Loading map...
Location: 00/01-25-027-26W4/0
Location Alias: 00/01-25-27-26 W4M
Location Alias 2: 00/01-25-027-26 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 25
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 1-25-27-26
Operator Name: Ember Resources Inc.
License Number: 0308235
License Date: 2004-05-07
License Status: Issued
Spud Date: 2004-06-29
Final Drill Date: 2004-07-11
Well Total Depth: 736.00 m
Surface Hole Latitude: 51.331084
Surface Hole Longitude: -113.526756

For data sources see[1][2]

Well History

Date Event
2004-05-07 Obtained License
2004-06-29 Surface Casing Operation Performed
2004-07-11 Finished Drilling
2004-07-11 Well Mode changed to Drilled and Cased
2004-07-12 Production Casing Operation Performed
2004-07-12 Rig Released
2004-07-23 Well Log Performed
2004-08-14 Perforation Treatment Performed - Jet Perforation
2004-09-06 Perforation Treatment Performed - Fractured
2005-02-26 Well Began Production
2005-02-26 Well Fluid changed to Coalbed Methane-Coals Only
2005-02-26 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-08-14 Perforation 205.10 206.10 13
2004-08-14 Perforation 383.60 384.60 13
2004-08-14 Perforation 438.30 440.30 13
2004-08-14 Perforation 456.50 457.50 13
2004-08-14 Perforation 458.40 459.10 13
2004-08-14 Perforation 461.00 462.00 13
2004-08-14 Perforation 466.70 467.70 13
2004-08-14 Perforation 476.60 477.60 13
2004-08-14 Perforation 481.80 482.80 13
2004-08-14 Perforation 487.10 488.10 13
2004-08-14 Perforation 492.70 493.70 13
2004-08-14 Perforation 215.90 216.90 13
2004-08-14 Perforation 510.90 511.90 13
2004-08-14 Perforation 512.90 513.90 13
2004-08-14 Perforation 535.50 536.50 13
2004-08-14 Perforation 543.00 544.00 13
2004-08-14 Perforation 549.30 550.30 13
2004-08-14 Perforation 555.30 556.30 13
2004-08-14 Perforation 568.00 569.00 13
2004-08-14 Perforation 576.50 577.50 13
2004-08-14 Perforation 581.90 582.90 13
2004-08-14 Perforation 583.60 584.60 13
2004-08-14 Perforation 228.80 229.80 13
2004-08-14 Perforation 593.40 594.40 13
2004-08-14 Perforation 610.30 612.30 13
2004-09-06 Fracture 205.10 612.30 0
2004-08-14 Perforation 257.70 258.70 13
2004-08-14 Perforation 312.50 313.50 13
2004-08-14 Perforation 319.70 320.70 13
2004-08-14 Perforation 327.70 328.70 13
2004-08-14 Perforation 334.80 335.80 13
2004-08-14 Perforation 340.50 341.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 7415 0.0 0.0 0.0
2006 8712 0.0 0.0 0.0
2007 8689 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8722 0.0 0.0 0.0
2012 8763 0.0 0.0 0.0
2013 8752 0.0 0.0 0.0
2014 8626 0.0 0.0 0.0
2015 8614 0.0 0.0 0.0
2016 8697 0.0 0.0 0.0
2017 8544 0.0 0.0 0.0
2018 8637 0.0 0.0 0.0
2019 8659 0.0 0.0 0.0
2020 2108 0.0 0.0 0.0

For data sources see[5]

References