X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274261506000

Well Details

Well ID: 0274261506000
Loading map...
Location: 00/06-15-027-26W4/0
Location Alias: 00/06-15-27-26 W4M
Location Alias 2: 00/06-15-027-26 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 15
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 6-15-27-26
Operator Name: Ember Resources Inc.
License Number: 0269459
License Date: 2002-04-22
License Status: Issued
Spud Date: 2002-05-13
Final Drill Date: 2002-05-15
Well Total Depth: 1031.00 m
Surface Hole Latitude: 51.306471
Surface Hole Longitude: -113.580622

For data sources see[1][2]

Well History

Date Event
2002-04-22 Obtained License
2002-05-13 Surface Casing Operation Performed
2002-05-15 Finished Drilling
2002-05-15 Well Log Performed
2002-05-16 Production Casing Operation Performed
2002-05-16 Rig Released
2002-05-16 Well Mode changed to Drilled and Cased
2002-07-11 Well Log Performed
2002-07-20 Perforation Treatment Performed - Jet Perforation
2002-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-11 Plug Back Performed
2002-09-11 Well Mode changed to Abandoned Zone
2002-09-15 Perforation Treatment Performed - Jet Perforation
2002-09-28 Perforation Treatment Performed - Fractured
2002-12-02 Perforation Treatment Performed - Jet Perforation
2004-08-14 Perforation Treatment Performed - Fractured
2005-09-29 Perforation Treatment Performed - Jet Perforation
2005-10-28 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-07-20 Perforation 926.00 928.00 7
2004-08-14 Fracture 722.00 724.00 0
2005-09-29 Perforation 640.80 641.30 13
2005-09-29 Perforation 639.50 640.00 13
2005-09-29 Perforation 624.50 625.00 13
2005-09-29 Perforation 622.50 623.00 13
2005-09-29 Perforation 613.40 613.90 13
2005-09-29 Perforation 608.00 608.50 13
2005-09-29 Perforation 603.50 604.50 13
2005-09-29 Perforation 592.60 593.10 13
2005-09-29 Perforation 562.40 562.90 13
2002-09-11 Packing Device Capped w/Cement 913.00 921.00 0
2005-09-29 Perforation 560.80 561.30 13
2005-09-29 Perforation 539.80 540.30 13
2005-09-29 Perforation 532.90 533.40 13
2005-09-29 Perforation 513.50 514.00 13
2005-09-29 Perforation 507.10 507.60 13
2005-09-29 Perforation 500.20 500.70 13
2005-09-29 Perforation 479.60 480.10 13
2005-09-29 Perforation 473.90 474.40 13
2005-09-29 Perforation 469.50 470.00 13
2005-09-29 Perforation 464.00 464.50 13
2002-09-15 Perforation 879.00 881.00 7
2005-09-29 Perforation 361.80 362.30 13
2005-09-29 Perforation 350.80 351.30 13
2005-09-29 Perforation 347.20 347.70 13
2005-09-29 Perforation 281.60 282.10 13
2005-09-29 Perforation 239.80 240.30 13
2005-09-29 Perforation 227.80 228.30 13
2005-09-29 Perforation 226.20 226.70 13
2005-10-28 Fracture 226.20 641.30 0
2002-09-15 Perforation 897.00 899.00 7
2002-09-28 Fracture 879.00 881.00 0
2002-12-02 Perforation 696.00 699.00 13
2002-12-02 Perforation 718.00 721.00 13
2002-12-02 Perforation 722.00 724.00 13
2004-08-14 Fracture 718.00 721.00 0

For data sources see[4]



References