X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274252601003

Well Details

Well ID: 0274252601003
Loading map...
Location: 00/01-26-027-25W4/3
Location Alias: 00/01-26-27-25 W4M
Location Alias 2: 00/01-26-027-25 W4/03
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 25
Section: 26
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 1-26-27-25
Operator Name: Ember Resources Inc.
License Number: 0218189
License Date: 1998-10-19
License Status: Issued
Spud Date: 1998-10-26
Final Drill Date: 1998-10-26
Well Total Depth: 935.00 m
Surface Hole Latitude: 51.331038
Surface Hole Longitude: -113.409418

For data sources see[1][2]

Well History

Date Event
1998-10-19 Obtained License
1998-10-26 Finished Drilling
1998-10-26 Surface Casing Operation Performed
1998-10-26 Well Mode changed to Drilled and Cased
1998-10-27 Production Casing Operation Performed
1998-10-27 Rig Released
1998-11-10 Well Log Performed
1998-11-14 Perforation Treatment Performed - Jet Perforation
1998-11-14 Well Log Performed
1998-11-15 Perforation Treatment Performed - Fractured
1999-01-26 Perforation Treatment Performed - Jet Perforation
1999-01-26 Well Log Performed
1999-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-03-27 Plug Back Performed
1999-03-27 Well Log Performed
1999-03-29 Perforation Treatment Performed - Fractured
1999-06-13 Perforation Treatment Performed - Jet Perforation
1999-06-13 Well Log Performed
1999-07-21 Well Log Performed
1999-08-09 Perforation Treatment Performed - Jet Perforation
1999-08-09 Well Log Performed
1999-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-14 Perforation Treatment Performed - Jet Perforation
1999-10-14 Plug Back Performed
1999-10-14 Well Log Performed
1999-10-14 Well Mode changed to Drilled and Cased
1999-10-15 Perforation Treatment Performed - Fractured
1999-10-18 Well Began Production
1999-10-18 Well Fluid changed to Gas
1999-10-18 Well Mode changed to Flowing
2019-11-19 Perforation Treatment Performed - Jet Perforation
2019-11-19 Well Log Performed
2019-12-17 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-11-14 Perforation 817.50 821.50 14
1999-10-14 Packing Device Capped w/Cement 607.00 615.00 0
1999-10-14 Perforation 480.00 483.00 13
1999-10-15 Fracture 480.00 483.00 0
2019-11-19 Perforation 248.90 249.90 13
2019-11-19 Perforation 263.00 264.00 13
2019-11-19 Perforation 272.90 273.90 13
2019-11-19 Perforation 308.50 310.00 13
2019-11-19 Perforation 350.50 353.00 13
2019-11-19 Perforation 371.80 372.80 13
2019-11-19 Perforation 374.50 375.50 13
1998-11-14 Perforation 829.00 830.00 14
2019-11-19 Perforation 381.60 382.60 13
2019-11-19 Perforation 391.00 392.00 13
2019-11-19 Perforation 392.90 393.90 13
2019-11-19 Perforation 398.20 399.20 13
2019-11-19 Perforation 401.60 402.60 13
2019-11-19 Perforation 408.50 411.50 13
2019-11-19 Perforation 419.00 423.00 13
2019-11-19 Perforation 427.50 428.50 13
2019-11-19 Perforation 432.00 434.00 13
2019-11-19 Perforation 450.00 452.50 13
1998-11-15 Fracture 817.50 830.00 0
2019-11-19 Perforation 476.40 477.40 13
2019-11-19 Perforation 483.20 484.20 13
2019-11-19 Perforation 490.20 491.20 13
2019-11-19 Perforation 495.70 496.70 13
2019-11-19 Perforation 506.20 507.20 13
2019-11-19 Perforation 513.90 514.90 13
2019-11-19 Perforation 519.30 520.30 13
2019-11-19 Perforation 522.20 523.20 13
2019-11-19 Perforation 531.10 532.10 13
2019-11-19 Perforation 548.90 549.90 13
1999-01-26 Perforation 642.00 650.00 13
2019-11-19 Perforation 559.60 560.60 13
2019-12-17 Fracture 248.90 249.90 0
2019-12-17 Fracture 263.00 264.00 0
2019-12-17 Fracture 272.90 273.90 0
2019-12-17 Fracture 308.50 310.00 0
2019-12-17 Fracture 350.50 353.00 0
2019-12-17 Fracture 371.80 372.80 0
2019-12-17 Fracture 374.50 375.50 0
2019-12-17 Fracture 381.60 382.60 0
2019-12-17 Fracture 391.00 392.00 0
1999-03-27 Packing Device Capped w/Cement 805.00 813.00 0
2019-12-17 Fracture 392.90 393.90 0
2019-12-17 Fracture 398.20 399.20 0
2019-12-17 Fracture 401.60 402.60 0
2019-12-17 Fracture 408.50 411.50 0
2019-12-17 Fracture 419.00 423.00 0
2019-12-17 Fracture 427.50 428.50 0
2019-12-17 Fracture 432.00 434.00 0
2019-12-17 Fracture 450.00 452.50 0
2019-12-17 Fracture 476.40 477.40 0
2019-12-17 Fracture 495.70 496.70 0
1999-03-29 Fracture 642.00 650.00 0
2019-12-17 Fracture 506.20 507.20 0
2019-12-17 Fracture 513.90 514.90 0
2019-12-17 Fracture 519.30 520.30 0
2019-12-17 Fracture 522.20 523.20 0
2019-12-17 Fracture 531.10 532.10 0
2019-12-17 Fracture 548.90 549.90 0
2019-12-17 Fracture 559.60 560.60 0
1999-06-13 Perforation 633.00 635.00 13
1999-08-09 Perforation 618.00 621.00 13
1999-08-09 Perforation 625.00 629.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 1738 0.0 0.0 0.0
2000 7393 0.0 0.0 0.0
2001 8255 0.0 0.0 0.0
2002 8477 0.0 0.0 0.0
2003 7800 0.0 0.0 0.0
2004 8712 0.0 0.0 0.0
2005 8447 0.0 0.0 0.0
2006 8648 0.0 0.0 0.0
2007 7131 0.0 0.0 0.0
2008 8609 0.0 0.0 0.0
2009 7429 0.0 0.0 0.0
2010 8586 0.0 0.0 0.0
2011 8704 0.0 0.0 0.0
2012 3192 0.0 0.0 0.0
2013 8638 0.0 0.0 0.0
2014 8606 0.0 0.0 0.0
2015 8746 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 1272 0.0 0.0 0.0
2019 7739 0.0 0.0 0.0
2020 1955 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-12-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References