If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274250602000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.273986,"lon":-113.504355,"icon":""}]} |
Location: 00/02-06-027-25W4/0 | |
Location Alias: 00/02-06-27-25 W4M | |
Location Alias 2: 00/02-06-027-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 25 | |
Section: 06 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 2-6-27-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0421478 | |
License Date: 2010-06-30 | |
License Status: Issued | |
Spud Date: 2010-10-12 | |
Final Drill Date: 2010-10-31 | |
Well Total Depth: 944.00 m | |
Surface Hole Latitude: 51.273986 | |
Surface Hole Longitude: -113.504355 |
Date | Event |
---|---|
2010-06-30 | Obtained License |
2010-10-12 | Surface Casing Operation Performed |
2010-10-22 | Well Log Performed |
2010-10-31 | Finished Drilling |
2010-10-31 | Well Mode changed to Drilled and Cased |
2010-11-01 | Production Casing Operation Performed |
2010-11-01 | Rig Released |
2010-11-01 | Well Log Performed |
2010-12-12 | Perforation Treatment Performed - Jet Perforation |
2010-12-15 | Perforation Treatment Performed - Fractured |
2011-02-05 | Well Began Production |
2011-02-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-05 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-12-12 | Perforation | 498.00 | 501.00 | 13 |
2010-12-12 | Perforation | 209.40 | 210.40 | 13 |
2010-12-12 | Perforation | 195.00 | 195.50 | 13 |
2010-12-12 | Perforation | 316.10 | 316.60 | 13 |
2010-12-12 | Perforation | 431.20 | 431.70 | 13 |
2010-12-12 | Perforation | 336.30 | 337.30 | 13 |
2010-12-12 | Perforation | 329.10 | 329.60 | 13 |
2010-12-12 | Perforation | 569.10 | 570.10 | 13 |
2010-12-12 | Perforation | 501.00 | 503.00 | 13 |
2010-12-12 | Perforation | 421.00 | 423.00 | 13 |
2010-12-12 | Perforation | 388.00 | 390.00 | 13 |
2010-12-12 | Perforation | 464.80 | 465.30 | 13 |
2010-12-12 | Perforation | 531.50 | 533.50 | 13 |
2010-12-12 | Perforation | 812.50 | 814.50 | 13 |
2010-12-12 | Perforation | 698.00 | 700.00 | 13 |
2010-12-12 | Perforation | 684.00 | 686.00 | 13 |
2010-12-12 | Perforation | 366.00 | 368.00 | 13 |
2010-12-12 | Perforation | 605.40 | 606.40 | 13 |
2010-12-12 | Perforation | 586.90 | 587.40 | 13 |
2010-12-12 | Perforation | 350.00 | 352.00 | 13 |
2010-12-15 | Fracture | 535.10 | 587.40 | 0 |
2010-12-15 | Fracture | 605.40 | 606.40 | 0 |
2010-12-12 | Perforation | 447.50 | 448.00 | 13 |
2010-12-15 | Fracture | 209.40 | 337.30 | 0 |
2010-12-15 | Fracture | 431.20 | 501.00 | 0 |
2010-12-15 | Fracture | 350.00 | 423.00 | 0 |
2010-12-15 | Fracture | 501.00 | 533.50 | 0 |
2010-12-15 | Fracture | 684.00 | 700.00 | 0 |
2010-12-15 | Fracture | 812.50 | 814.50 | 0 |
2010-12-12 | Perforation | 535.10 | 535.60 | 13 |
2010-12-12 | Perforation | 564.30 | 565.80 | 13 |
2010-12-12 | Perforation | 559.40 | 559.90 | 13 |
2010-12-12 | Perforation | 541.10 | 542.10 | 13 |
2010-12-12 | Perforation | 432.30 | 433.30 | 13 |
2010-12-12 | Perforation | 309.20 | 309.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7909 | 0.0 | 0.0 | 0.0 |
2012 | 5055 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8716 | 0.0 | 0.0 | 0.0 |
2015 | 8630 | 0.0 | 0.0 | 0.0 |
2016 | 8758 | 0.0 | 0.0 | 0.0 |
2017 | 8578 | 0.0 | 0.0 | 0.0 |
2018 | 8648 | 0.0 | 0.0 | 0.0 |
2019 | 8610 | 0.0 | 0.0 | 0.0 |
2020 | 2174 | 0.0 | 0.0 | 0.0 |
For data sources see[5]