X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274242710020

Well Details

Well ID: 0274242710020
Loading map...
Location: 02/10-27-027-24W4/0
Location Alias: 02/10-27-27-24 W4M
Location Alias 2: 02/10-27-027-24 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 24
Section: 27
County/Municipality: Wheatland County
Well Name: EMBER 102 ENTICE 10-27-27-24
Operator Name: Ember Resources Inc.
License Number: 0201470
License Date: 1997-05-20
License Status: Issued
Spud Date: 1997-06-09
Final Drill Date: 1997-06-09
Well Total Depth: 506.00 m
Surface Hole Latitude: 51.336553
Surface Hole Longitude: -113.297861

For data sources see[1][2]

Well History

Date Event
1997-05-20 Obtained License
1997-06-09 Finished Drilling
1997-06-10 Production Casing Operation Performed
1997-06-10 Rig Released
1997-06-10 Well Mode changed to Drilled and Cased
1997-07-23 Well Log Performed
1997-07-25 Well Log Performed
1997-09-23 Perforation Treatment Performed - Jet Perforation
1997-10-08 Perforation Treatment Performed - Fractured
1999-06-01 Well Began Production
1999-06-01 Well Fluid changed to Gas
1999-06-01 Well Mode changed to Flowing
2005-04-05 Perforation Treatment Performed - Jet Perforation
2005-04-29 Perforation Treatment Performed - Fractured
2005-07-08 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-09-23 Perforation 434.00 437.00 7
2005-04-05 Perforation 409.40 409.90 13
2005-04-05 Perforation 407.50 408.00 13
2005-04-05 Perforation 401.40 401.90 13
2005-04-05 Perforation 392.00 392.50 13
2005-04-05 Perforation 386.40 386.90 13
2005-04-05 Perforation 378.40 378.90 13
2005-04-05 Perforation 370.50 371.00 13
2005-04-05 Perforation 369.30 369.80 13
2005-04-05 Perforation 368.10 368.60 13
2005-04-05 Perforation 363.80 364.30 13
1997-09-23 Perforation 441.00 444.00 7
2005-04-05 Perforation 361.80 362.30 13
2005-04-05 Perforation 347.80 348.30 13
2005-04-05 Perforation 345.00 345.50 13
2005-04-05 Perforation 341.40 341.90 13
2005-04-05 Perforation 290.20 290.70 13
2005-04-05 Perforation 283.60 284.10 13
2005-04-05 Perforation 246.80 247.80 13
2005-04-05 Perforation 238.20 238.70 13
2005-04-05 Perforation 227.00 227.50 13
2005-04-05 Perforation 215.90 216.40 13
1997-10-08 Fracture 434.00 444.00 0
2005-04-29 Fracture 215.90 480.70 0
2005-04-05 Perforation 480.20 480.70 13
2005-04-05 Perforation 476.00 476.50 13
2005-04-05 Perforation 469.90 470.40 13
2005-04-05 Perforation 462.70 463.20 13
2005-04-05 Perforation 453.70 454.20 13
2005-04-05 Perforation 447.20 447.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 4964 0.0 0.0 0.0
2000 8548 0.0 0.0 0.0
2001 8684 0.0 0.0 0.0
2002 8690 0.0 0.0 0.0
2003 8671 0.0 0.0 0.0
2004 8700 0.0 0.0 0.0
2005 4339 0.0 0.0 0.0

For data sources see[5]

References