If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274242605002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.335479,"lon":-113.285853,"icon":""}]} |
Location: 00/05-26-027-24W4/2 | |
Location Alias: 00/05-26-27-24 W4M | |
Location Alias 2: 00/05-26-027-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 24 | |
Section: 26 | |
County/Municipality: Wheatland County | |
Well Name: EMBER 5C ENTICE 5-26-27-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0227970 | |
License Date: 1999-10-28 | |
License Status: Issued | |
Spud Date: 1999-11-16 | |
Final Drill Date: 1999-11-16 | |
Well Total Depth: 923.00 m | |
Surface Hole Latitude: 51.335479 | |
Surface Hole Longitude: -113.285853 |
Date | Event |
---|---|
1999-10-28 | Obtained License |
1999-11-16 | Finished Drilling |
1999-11-16 | Well Mode changed to Drilled and Cased |
1999-11-17 | Production Casing Operation Performed |
1999-11-17 | Rig Released |
1999-11-18 | Well Log Performed |
1999-11-30 | Perforation Treatment Performed - Jet Perforation |
1999-12-05 | Perforation Treatment Performed - Fractured |
2003-04-21 | Perforation Treatment Performed - Jet Perforation |
2003-04-22 | Well Fluid changed to Gas |
2003-04-22 | Well Mode changed to Testing |
2003-05-27 | Perforation Treatment Performed - Fractured |
2003-06-05 | Well Began Production |
2003-06-05 | Well Fluid changed to Gas |
2003-06-05 | Well Mode changed to Flowing |
2005-04-05 | Perforation Treatment Performed - Jet Perforation |
2005-05-02 | Perforation Treatment Performed - Fractured |
2005-07-27 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-11-30 | Perforation | 793.00 | 795.00 | 7 |
2005-04-05 | Perforation | 547.40 | 547.90 | 13 |
2005-04-05 | Perforation | 539.60 | 540.10 | 13 |
2005-04-05 | Perforation | 528.40 | 528.90 | 13 |
2005-04-05 | Perforation | 526.90 | 527.40 | 13 |
2005-04-05 | Perforation | 525.90 | 526.40 | 13 |
2005-04-05 | Perforation | 492.80 | 493.30 | 13 |
2005-04-05 | Perforation | 490.60 | 491.10 | 13 |
2005-04-05 | Perforation | 484.50 | 485.00 | 13 |
2005-04-05 | Perforation | 478.20 | 478.70 | 13 |
2005-04-05 | Perforation | 471.40 | 471.90 | 13 |
1999-12-05 | Fracture | 793.00 | 795.00 | 0 |
2005-04-05 | Perforation | 463.50 | 464.50 | 13 |
2005-04-05 | Perforation | 456.40 | 456.90 | 13 |
2005-04-05 | Perforation | 418.00 | 418.50 | 13 |
2005-04-05 | Perforation | 411.20 | 412.20 | 13 |
2005-04-05 | Perforation | 399.80 | 400.30 | 13 |
2005-04-05 | Perforation | 386.70 | 387.20 | 13 |
2005-04-05 | Perforation | 377.00 | 377.50 | 13 |
2005-04-05 | Perforation | 374.10 | 374.60 | 13 |
2005-04-05 | Perforation | 373.00 | 373.50 | 13 |
2005-04-05 | Perforation | 356.70 | 357.20 | 13 |
2003-04-21 | Perforation | 730.00 | 732.00 | 13 |
2005-04-05 | Perforation | 353.90 | 354.40 | 13 |
2005-04-05 | Perforation | 350.30 | 350.80 | 13 |
2005-04-05 | Perforation | 341.40 | 341.90 | 13 |
2005-04-05 | Perforation | 303.20 | 303.70 | 13 |
2005-04-05 | Perforation | 274.20 | 274.70 | 13 |
2005-04-05 | Perforation | 260.80 | 261.30 | 13 |
2005-04-05 | Perforation | 244.30 | 244.80 | 13 |
2005-04-05 | Perforation | 233.20 | 233.70 | 13 |
2005-05-02 | Fracture | 233.20 | 547.90 | 0 |
2003-04-21 | Perforation | 674.00 | 676.00 | 13 |
2003-04-21 | Perforation | 599.00 | 602.00 | 13 |
2003-04-21 | Perforation | 445.00 | 448.00 | 13 |
2003-05-27 | Fracture | 730.00 | 732.00 | 0 |
2003-05-27 | Fracture | 599.00 | 602.00 | 0 |
2003-05-27 | Fracture | 445.00 | 448.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 5136 | 0.0 | 0.0 | 0.0 |
2005 | 2879 | 0.0 | 0.0 | 0.0 |
For data sources see[5]