X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274242516000

Well Details

Well ID: 0274242516000
Loading map...
Location: 00/16-25-027-24W4/0
Location Alias: 00/16-25-27-24 W4M
Location Alias 2: 00/16-25-027-24 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 24
Section: 25
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 16-25-27-24
Operator Name: Ember Resources Inc.
License Number: 0327689
License Date: 2005-03-07
License Status: Issued
Spud Date: 2005-05-09
Final Drill Date: 2005-05-10
Well Total Depth: 632.00 m
Surface Hole Latitude: 51.342344
Surface Hole Longitude: -113.245039

For data sources see[1][2]

Well History

Date Event
2005-03-07 Obtained License
2005-05-09 Surface Casing Operation Performed
2005-05-10 Finished Drilling
2005-05-10 Production Casing Operation Performed
2005-05-10 Rig Released
2005-05-10 Well Mode changed to Drilled and Cased
2005-05-12 Well Log Performed
2005-05-31 Perforation Treatment Performed - Jet Perforation
2005-07-02 Perforation Treatment Performed - Jet Perforation
2005-07-18 Perforation Treatment Performed - Fractured
2008-09-18 Well Began Production
2008-09-18 Well Fluid changed to Coalbed Methane-Coals and Other
2008-09-18 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-05-31 Perforation 562.00 564.00 13
2005-07-02 Perforation 452.90 453.40 13
2005-07-02 Perforation 443.90 444.40 13
2005-07-02 Perforation 436.10 436.60 13
2005-07-02 Perforation 393.80 394.30 13
2005-07-02 Perforation 390.20 390.70 13
2005-07-02 Perforation 384.90 385.40 13
2005-07-02 Perforation 378.60 379.10 13
2005-07-02 Perforation 363.60 364.10 13
2005-07-02 Perforation 354.20 354.70 13
2005-07-02 Perforation 345.80 346.30 13
2005-07-02 Perforation 509.20 509.70 13
2005-07-02 Perforation 338.60 339.10 13
2005-07-02 Perforation 334.70 335.20 13
2005-07-02 Perforation 333.50 334.00 13
2005-07-02 Perforation 317.00 317.50 13
2005-07-02 Perforation 289.70 290.20 13
2005-07-02 Perforation 282.60 283.10 13
2005-07-02 Perforation 239.30 239.80 13
2005-07-02 Perforation 224.90 225.40 13
2005-07-02 Perforation 220.60 221.10 13
2005-07-18 Fracture 220.60 509.70 0
2005-07-02 Perforation 507.90 508.40 13
2005-07-02 Perforation 506.90 507.40 13
2005-07-02 Perforation 474.20 474.70 13
2005-07-02 Perforation 471.70 472.20 13
2005-07-02 Perforation 470.40 470.90 13
2005-07-02 Perforation 465.90 466.40 13
2005-07-02 Perforation 460.00 460.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 2520 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8726 0.0 0.0 0.0
2012 8713 0.0 0.0 0.0
2013 8752 0.0 0.0 0.0
2014 8660 0.0 0.0 0.0
2015 8598 0.0 0.0 0.0
2016 8705 0.0 0.0 0.0
2017 8696 0.0 0.0 0.0
2018 8708 0.0 0.0 0.0
2019 8635 0.0 0.0 0.0
2020 2096 0.0 0.0 0.0

For data sources see[5]

References