X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274242203000

Well Details

Well ID: 0274242203000
Loading map...
Location: 00/03-22-027-24W4/0
Location Alias: 00/03-22-27-24 W4M
Location Alias 2: 00/03-22-027-24 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 24
Section: 22
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 3-22-27-24
Operator Name: Ember Resources Inc.
License Number: 0394176
License Date: 2008-02-14
License Status: Issued
Spud Date: 2008-02-17
Final Drill Date: 2008-02-18
Well Total Depth: 939.00 m
Surface Hole Latitude: 51.313526
Surface Hole Longitude: -113.307080

For data sources see[1][2]

Well History

Date Event
2008-02-14 Obtained License
2008-02-17 Direction Drilling Operation Performed - Deviate
2008-02-17 Surface Casing Operation Performed
2008-02-18 Finished Drilling
2008-02-18 Production Casing Operation Performed
2008-02-18 Rig Released
2008-02-18 Well Mode changed to Drilled and Cased
2008-02-27 Well Log Performed
2008-03-09 Perforation Treatment Performed - Jet Perforation
2008-07-16 Perforation Treatment Performed - Fractured
2008-07-29 Well Began Production
2008-07-29 Well Fluid changed to Coalbed Methane-Coals Only
2008-07-29 Well Mode changed to Flowing
2010-01-25 Perforation Treatment Performed - Jet Perforation
2010-02-08 Well Structure changed to Commingled
2010-02-14 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-02-17 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-03-09 Perforation 754.90 755.40 13
2008-03-09 Perforation 577.70 578.70 13
2008-03-09 Perforation 574.50 576.50 13
2008-03-09 Perforation 573.90 574.40 13
2008-03-09 Perforation 571.60 572.10 13
2008-03-09 Perforation 559.30 560.30 13
2008-03-09 Perforation 548.60 549.10 13
2008-03-09 Perforation 524.90 525.90 13
2008-03-09 Perforation 520.90 521.90 13
2008-03-09 Perforation 515.00 516.00 13
2008-03-09 Perforation 485.80 486.30 13
2008-03-09 Perforation 738.30 738.80 13
2008-03-09 Perforation 479.60 480.60 13
2008-03-09 Perforation 405.80 406.30 13
2008-03-09 Perforation 335.10 335.60 13
2008-03-09 Perforation 329.80 330.30 13
2008-07-16 Fracture 329.80 755.40 0
2010-01-25 Perforation 859.00 860.00 13
2010-01-25 Perforation 851.50 853.50 13
2010-01-25 Perforation 617.00 621.00 13
2010-01-25 Perforation 506.00 508.00 13
2010-02-14 Fracture 851.50 853.50 0
2008-03-09 Perforation 691.80 692.80 13
2008-03-09 Perforation 690.50 691.50 13
2008-03-09 Perforation 683.30 684.30 13
2008-03-09 Perforation 672.70 673.70 13
2008-03-09 Perforation 659.00 660.00 13
2008-03-09 Perforation 625.70 626.20 13
2008-03-09 Perforation 579.00 579.50 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 3744 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 744 0.0 0.0 0.0

For data sources see[6]

References