If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274241412002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.308883,"lon":-113.282407,"icon":""}]} |
Location: 00/12-14-027-24W4/2 | |
Location Alias: 00/12-14-27-24 W4M | |
Location Alias 2: 00/12-14-027-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 24 | |
Section: 14 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 12-14-27-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0376538 | |
License Date: 2007-04-18 | |
License Status: Issued | |
Spud Date: 2007-07-23 | |
Final Drill Date: 2007-07-30 | |
Well Total Depth: 597.00 m | |
Surface Hole Latitude: 51.308883 | |
Surface Hole Longitude: -113.282407 |
Date | Event |
---|---|
2007-04-18 | Obtained License |
2007-07-23 | Surface Casing Operation Performed |
2007-07-30 | Finished Drilling |
2007-07-30 | Well Mode changed to Drilled and Cased |
2007-07-31 | Production Casing Operation Performed |
2007-07-31 | Rig Released |
2007-08-05 | Well Log Performed |
2007-08-29 | Perforation Treatment Performed - Jet Perforation |
2007-09-02 | Perforation Treatment Performed - Fractured |
2010-01-29 | Perforation Treatment Performed - Jet Perforation |
2010-02-14 | Perforation Treatment Performed - Fractured |
2010-02-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-02-17 | Well Mode changed to Testing |
2010-02-24 | Well Began Production |
2010-02-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-02-24 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-08-29 | Perforation | 480.40 | 480.90 | 13 |
2007-08-29 | Perforation | 358.40 | 358.90 | 13 |
2007-08-29 | Perforation | 350.10 | 351.10 | 13 |
2007-08-29 | Perforation | 346.20 | 346.70 | 13 |
2007-08-29 | Perforation | 325.80 | 326.80 | 13 |
2007-08-29 | Perforation | 323.40 | 323.90 | 13 |
2007-08-29 | Perforation | 320.40 | 321.40 | 13 |
2007-08-29 | Perforation | 301.80 | 302.30 | 13 |
2007-08-29 | Perforation | 298.10 | 298.60 | 13 |
2007-08-29 | Perforation | 246.10 | 247.10 | 13 |
2007-08-29 | Perforation | 205.30 | 205.80 | 13 |
2007-08-29 | Perforation | 470.80 | 471.30 | 13 |
2007-09-02 | Fracture | 205.30 | 480.90 | 0 |
2010-01-29 | Perforation | 545.00 | 547.00 | 13 |
2010-01-29 | Perforation | 519.00 | 522.00 | 13 |
2010-01-29 | Perforation | 409.00 | 411.00 | 13 |
2010-01-29 | Perforation | 394.00 | 396.00 | 13 |
2010-01-29 | Perforation | 290.00 | 291.00 | 13 |
2010-01-29 | Perforation | 277.00 | 279.00 | 13 |
2010-01-29 | Perforation | 262.00 | 266.00 | 13 |
2010-02-14 | Fracture | 545.00 | 547.00 | 0 |
2010-02-14 | Fracture | 519.00 | 522.00 | 0 |
2007-08-29 | Perforation | 434.10 | 436.10 | 13 |
2007-08-29 | Perforation | 429.50 | 430.50 | 13 |
2007-08-29 | Perforation | 423.20 | 424.20 | 13 |
2007-08-29 | Perforation | 416.50 | 417.00 | 13 |
2007-08-29 | Perforation | 405.10 | 405.60 | 13 |
2007-08-29 | Perforation | 398.90 | 399.40 | 13 |
2007-08-29 | Perforation | 359.60 | 362.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7467 | 0.0 | 0.0 | 0.0 |
2011 | 8726 | 0.0 | 0.0 | 0.0 |
2012 | 8713 | 0.0 | 0.0 | 0.0 |
2013 | 8752 | 0.0 | 0.0 | 0.0 |
2014 | 8660 | 0.0 | 0.0 | 0.0 |
2015 | 8598 | 0.0 | 0.0 | 0.0 |
2016 | 8705 | 0.0 | 0.0 | 0.0 |
2017 | 8696 | 0.0 | 0.0 | 0.0 |
2018 | 8708 | 0.0 | 0.0 | 0.0 |
2019 | 8635 | 0.0 | 0.0 | 0.0 |
2020 | 2096 | 0.0 | 0.0 | 0.0 |
For data sources see[5]