X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274241013000

Well Details

Well ID: 0274241013000
Loading map...
Location: 00/13-10-027-24W4/0
Location Alias: 00/13-10-27-24 W4M
Location Alias 2: 00/13-10-027-24 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 24
Section: 10
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 13-10-27-24
Operator Name: Ember Resources Inc.
License Number: 0429158
License Date: 2010-12-29
License Status: Issued
Spud Date: 2011-01-06
Final Drill Date: 2011-01-15
Well Total Depth: 619.70 m
Surface Hole Latitude: 51.297116
Surface Hole Longitude: -113.307714

For data sources see[1][2]

Well History

Date Event
2010-12-29 Obtained License
2011-01-06 Surface Casing Operation Performed
2011-01-15 Finished Drilling
2011-01-15 Production Casing Operation Performed
2011-01-15 Rig Released
2011-01-15 Well Mode changed to Drilled and Cased
2011-01-20 Well Log Performed
2011-03-10 Perforation Treatment Performed - Jet Perforation
2011-05-17 Perforation Treatment Performed - Fractured
2011-07-25 Well Began Production
2011-07-25 Well Fluid changed to Coalbed Methane-Coals and Other
2011-07-25 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-10 Perforation 353.20 354.20 13
2011-03-10 Perforation 330.80 332.30 13
2011-03-10 Perforation 469.40 470.90 13
2011-03-10 Perforation 463.10 464.60 13
2011-03-10 Perforation 508.40 508.90 13
2011-03-10 Perforation 527.80 528.30 13
2011-03-10 Perforation 518.60 519.10 13
2011-03-10 Perforation 436.10 436.60 13
2011-03-10 Perforation 395.40 396.40 13
2011-03-10 Perforation 443.30 443.80 13
2011-03-10 Perforation 456.50 458.00 13
2011-03-10 Perforation 350.50 352.00 13
2011-03-10 Perforation 449.10 450.10 13
2011-03-10 Perforation 311.00 312.00 13
2011-03-10 Perforation 303.00 306.00 13
2011-03-10 Perforation 316.00 318.00 13
2011-03-10 Perforation 356.00 358.00 13
2011-03-10 Perforation 346.00 349.00 13
2011-03-10 Perforation 215.00 218.00 13
2011-03-10 Perforation 210.00 213.00 13
2011-03-10 Perforation 250.00 252.00 13
2011-03-10 Perforation 288.00 291.00 13
2011-03-10 Perforation 375.10 375.60 13
2011-03-10 Perforation 265.00 267.00 13
2011-03-10 Perforation 581.00 583.00 13
2011-03-10 Perforation 576.00 577.00 13
2011-03-10 Perforation 235.90 236.40 13
2011-03-10 Perforation 222.30 222.80 13
2011-03-10 Perforation 565.00 568.00 13
2011-03-10 Perforation 386.50 389.50 13
2011-03-10 Perforation 398.00 401.00 13
2011-03-10 Perforation 477.00 479.00 13
2011-03-10 Perforation 431.00 434.00 13
2011-03-10 Perforation 381.70 382.20 13
2011-05-17 Fracture 210.00 583.00 0
2011-03-10 Perforation 378.10 379.60 13
2011-03-10 Perforation 280.80 281.30 13
2011-03-10 Perforation 239.80 240.80 13
2011-03-10 Perforation 281.80 282.30 13
2011-03-10 Perforation 333.90 334.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 3834 0.0 0.0 0.0
2012 8779 0.0 0.0 0.0
2013 8716 0.0 0.0 0.0
2014 8713 0.0 0.0 0.0
2015 8712 0.0 0.0 0.0
2016 8743 0.0 0.0 0.0
2017 8602 0.0 0.0 0.0
2018 8727 0.0 0.0 0.0
2019 8721 0.0 0.0 0.0
2020 2164 0.0 0.0 0.0

For data sources see[5]

References