If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274241008005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.289367,"lon":-113.288006,"icon":""}]} |
Location: 00/08-10-027-24W4/5 | |
Location Alias: 00/08-10-27-24 W4M | |
Location Alias 2: 00/08-10-027-24 W4/05 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 24 | |
Section: 10 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 8-10-27-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0260524 | |
License Date: 2001-10-15 | |
License Status: Issued | |
Spud Date: 2001-10-20 | |
Final Drill Date: 2001-10-27 | |
Well Total Depth: 920.00 m | |
Surface Hole Latitude: 51.289367 | |
Surface Hole Longitude: -113.288006 |
Date | Event |
---|---|
2001-10-15 | Obtained License |
2001-10-20 | Surface Casing Operation Performed |
2001-10-27 | Finished Drilling |
2001-10-27 | Well Mode changed to Drilled and Cased |
2001-10-28 | Production Casing Operation Performed |
2001-10-28 | Rig Released |
2001-10-28 | Well Log Performed |
2001-11-11 | Well Log Performed |
2001-11-12 | Well Log Performed |
2001-11-30 | Perforation Treatment Performed - Jet Perforation |
2002-02-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-02-19 | Perforation Treatment Performed - Jet Perforation |
2002-02-19 | Plug Back Performed |
2002-06-07 | Perforation Treatment Performed - Fractured |
2002-07-05 | Perforation Treatment Performed - Jet Perforation |
2002-08-02 | Perforation Treatment Performed - Jet Perforation |
2002-09-19 | Perforation Treatment Performed - Fractured |
2005-12-08 | Perforation Treatment Performed - Jet Perforation |
2006-01-09 | Perforation Treatment Performed - Fractured |
2006-01-25 | Perforation Treatment Performed - Jet Perforation |
2006-02-01 | Perforation Treatment Performed - Fractured |
2006-02-05 | Well Fluid changed to Gas |
2006-02-05 | Well Mode changed to Testing |
2006-03-06 | Perforation Treatment Performed - Jet Perforation |
2006-03-06 | Well Log Performed |
2006-03-09 | Perforation Treatment Performed - Fractured |
2006-05-17 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-11-30 | Perforation | 734.00 | 736.00 | 7 |
2002-08-02 | Perforation | 570.50 | 571.50 | 7 |
2002-09-19 | Fracture | 570.50 | 587.00 | 0 |
2005-12-08 | Perforation | 553.00 | 554.00 | 13 |
2006-01-09 | Fracture | 553.00 | 554.00 | 0 |
2006-01-25 | Perforation | 287.00 | 289.00 | 13 |
2006-02-01 | Fracture | 287.00 | 289.00 | 0 |
2006-03-06 | Perforation | 517.60 | 518.10 | 13 |
2006-03-06 | Perforation | 508.10 | 508.60 | 13 |
2006-03-06 | Perforation | 496.20 | 496.70 | 13 |
2006-03-06 | Perforation | 469.10 | 469.60 | 13 |
2001-11-30 | Perforation | 747.50 | 750.50 | 7 |
2006-03-06 | Perforation | 467.90 | 468.40 | 13 |
2006-03-06 | Perforation | 462.80 | 463.30 | 13 |
2006-03-06 | Perforation | 455.10 | 455.60 | 13 |
2006-03-06 | Perforation | 447.90 | 448.40 | 13 |
2006-03-06 | Perforation | 443.60 | 444.10 | 13 |
2006-03-06 | Perforation | 436.00 | 436.50 | 13 |
2006-03-06 | Perforation | 393.20 | 393.70 | 13 |
2006-03-06 | Perforation | 392.40 | 392.90 | 13 |
2006-03-06 | Perforation | 390.20 | 390.70 | 13 |
2006-03-06 | Perforation | 389.10 | 389.60 | 13 |
2002-02-19 | Packing Device Capped w/Cement | 719.00 | 727.00 | 0 |
2006-03-06 | Perforation | 380.10 | 380.60 | 13 |
2006-03-06 | Perforation | 375.50 | 376.00 | 13 |
2006-03-06 | Perforation | 355.30 | 355.80 | 13 |
2006-03-06 | Perforation | 353.10 | 353.60 | 13 |
2006-03-06 | Perforation | 349.80 | 350.30 | 13 |
2006-03-06 | Perforation | 330.40 | 330.90 | 13 |
2006-03-06 | Perforation | 328.00 | 328.50 | 13 |
2006-03-06 | Perforation | 327.00 | 327.50 | 13 |
2006-03-06 | Perforation | 274.50 | 275.00 | 13 |
2006-03-06 | Perforation | 226.60 | 227.10 | 13 |
2002-02-19 | Perforation | 694.50 | 696.50 | 7 |
2006-03-09 | Fracture | 226.60 | 518.10 | 0 |
2002-06-07 | Fracture | 694.50 | 696.50 | 0 |
2002-07-05 | Perforation | 658.50 | 665.50 | 7 |
2002-07-05 | Perforation | 666.50 | 668.50 | 7 |
2002-08-02 | Perforation | 584.00 | 587.00 | 7 |
2002-08-02 | Perforation | 579.00 | 583.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 48 | 0.0 | 0.0 | 0.0 |
For data sources see[5]